autotelic.build

DESIGN · BUILD · AUTOMATE

AURORA SERVICES

Epoxy Coatings in Aurora

Licensed epoxy coatings services for Aurora and Arapahoe/Adams County. Durable, beautiful floor finishes.

  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Epoxy Coatings

Durable, beautiful floor finishes

Local Service

Epoxy Coatings Services in Aurora, Colorado

Autotelic provides professional epoxy coatings services throughout Aurora and the surrounding Arapahoe/Adams County area. Garage, commercial, and industrial epoxy floor coatings including solid, flake, and metallic finishes with proper surface prep. Whether you're in Aurora (Colorado's third-largest city) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.

Permits & Licensing

Permits in Aurora

Aurora building permits are issued by the Building Division's Permit Center, which also handles public improvement, sign, and lawn and irrigation permits. Contractor licensing is a City of Aurora requirement, and applications go through the Aurora4Biz.org online portal. Authority: City of Aurora — Building Division (Permit Center).

Permit Thresholds

Aurora permit thresholds

Code reference
Permits are generally required for residential remodel work in Aurora, Colorado, per the adopted building codes (primarily the 2021 International Residential Code (IRC) with local amendments in Aurora City Code Chapter 22, Article V), unless specifically exempt.
Aurora City Code § 22-184 (amending IRC R105.2) exempts only
one-story detached accessory residential storage sheds, playhouses, or shade structures ≤120 sq ft, not attached to the residence, and not used for vehicle storage.§ 22-184
Code reference
Aurora City Code § 22-135 (amending IBC 105.2) has similar limited exemptions for certain small accessory structures, fences ≤7 ft high (plus all chain-link fences), and antennae/towers ≤25 ft high.§ 22-135
Structural triggers
Any structural alteration, addition, or work affecting load-bearing elements generally requires a permit under the adopted IRC (see R105 and amendments).
Use tax (construction materials use tax)
Prior to permit issuance, a deposit is required based on 3.75% (three and three-fourths percent) applied to 50% of the total estimated cost of the building/construction/reconstruction/alteration/expansion/modification/improvement (or 100% of the total estimated cost of construction materials/
Code reference
This is per Aurora City Code § 130-61.§ 130-61.
Code reference
All information is based on the Aurora Municipal Code (Chapter 22) and official city resources.

Codes are amended regularly — verify current requirements with City of Aurora — Building Division (Permit Center).

Energy Code

Aurora energy code quick facts

Code reference
Aurora, Colorado, has adopted the 2021 International Energy Conservation Code (IECC) as its base energy code (with the Colorado Model Electric Ready and Solar Ready Code also required by state law).
Code reference
Aurora is in IECC Climate Zone 5B.
Code reference
The adopting provision is Aurora City Code § 22-203 (Code adopted, under Article VI, International Energy Conservation Code).§ 22-203
Code reference
Key prescriptive requirements relevant to remodels/additions (drawn from 2021 IECC Table R402.1.2 and related sections for CZ 5B; these apply unless a performance path or other compliance option is used):
Ceiling/attic insulation
R-49 (2021 IECC Table R402.1.2, CZ 5B).
Wood-frame wall insulation
R-20 or 13 + 5ci (continuous insulation) (2021 IECC Table R402.1.2, CZ 5B).
Floor insulation (over unconditioned space)
R-30 (2021 IECC Table R402.1.2, CZ 5B).
Fenestration (windows)
Maximum U-factor 0.30 and SHGC 0.40 (2021 IECC Table R402.1.2, CZ 5B).

Codes are amended regularly — verify current requirements with City of Aurora — Building Division (Permit Center).

Zoning & Dimensional Standards

Setback & dimensional standards in Aurora

Zone-district dimensional standards for Aurora, quoted verbatim from the Aurora Unified Development Ordinance. Knowing your lot's district — and its setbacks, height, and coverage limits — is where every feasibility conversation starts.

I-1setback & dimensional standards
StandardRequirement
Rear Setback (min)5 ft.

Aurora Unified Development Ordinance I-1 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

I-2setback & dimensional standards
StandardRequirement
Rear Setback (min)5 ft.

Aurora Unified Development Ordinance I-2 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-1setback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)6,000 sf. [1]
Lot Frontage, Single-Family Detached (min)Subarea A: 50 ft. Subarea B: 60 ft.
Front Setback (min)25 ft. [4]
Side Interior Setback (min)5 ft. [6]
Side Setback Abutting Local Street (min)12.5 ft.
Rear Setback (min)20 ft.
Building Height (max)38 ft.

Aurora Unified Development Ordinance R-1 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-2setback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)6,000 sf. [1]
Lot Frontage, Single-Family Detached (min)Subarea A: 50 ft. Subarea B: 60 ft.
Front Setback (min)20 ft. [4]
Side Interior Setback (min)5 ft.[6]
Side Setback Abutting Local Street (min)10 ft.
Rear Setback (min)15 ft.
Building Height (max)38 ft.

Aurora Unified Development Ordinance R-2 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-3setback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)5,000 sf.
Lot Frontage, Single-Family Detached (min)50 ft.
Front Setback (min)15 ft.
Side Interior Setback (min)5 ft.
Side Setback Abutting Local Street (min)10 ft.
Rear Setback (min)10 ft.
Building Height (max)45 ft.[7]

Aurora Unified Development Ordinance R-3 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-4setback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)5,000 sf.
Lot Frontage, Single-Family Detached (min)50 ft.
Front Setback (min)12 ft.
Side Interior Setback (min)5 ft.
Side Setback Abutting Local Street (min)7.5 ft.
Rear Setback (min)10 ft.
Building Height (max)65 ft.[8]

Aurora Unified Development Ordinance R-4 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-MHsetback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)[2]
Front Setback (min)15 ft.
Side Interior Setback (min)5 ft.
Side Setback Abutting Local Street (min)15 ft.
Rear Setback (min)8 ft.
Building Height (max)20 ft.[9]

Aurora Unified Development Ordinance R-MH setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-Rsetback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)43,560 sf.
Lot Frontage, Single-Family Detached (min)120 ft.
Front Setback (min)30 ft.
Side Interior Setback (min)10 ft.
Side Setback Abutting Local Street (min)25 ft.
Rear Setback (min)25 ft.
Building Height (max)38 ft.

Aurora Unified Development Ordinance R-R setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

Verify current requirements with the jurisdiction — informational reference only. Standards vary by overlay, lot, and use; we confirm the exact rules for your property during feasibility.

text

What this covers

Resin floor or wall coatings over concrete or a prepared slab. Prep (grind, crack fill, moisture check) drives whether the coating will stay down.

text

How the work is coordinated

Cure time depends on product and temperature; no invented mil-thickness brands. Denver-metro work is permitted locally. Colorado has no statewide general-contractor license. Cities and counties license general contractors. DORA licenses electrical and plumbing (and similar regulated trades), not general contractors. Autotelic is a municipally licensed Denver general contractor that coordinates licensed specialty trades. Denver building permits run through Community Planning and Development (CPD). Costs are project-specific; no dollar figures.

FAQ

Common questions

Who handles the epoxy coatings permits and licensing?

A municipally licensed Denver general contractor coordinates licensed specialty trades. Colorado has no statewide general-contractor license; cities and counties license general contractors. DORA licenses electrical and plumbing, not general contractors.

What is typically in scope for epoxy coatings in Denver?

Resin floor or wall coatings over concrete or a prepared slab.

When do you need drawings or a permit?

Anything that changes structure, occupancy, or regulated electrical or plumbing usually needs a local permit. Denver building permits are reviewed by Community Planning and Development. Confirm the exact trigger with CPD for the address.

Service Area

Serving Aurora and Arapahoe/Adams County

We serve Aurora, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Aurora project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

TRUSTED TO BUILD FOR

  • Punch Bowl SocialFirst four locations
  • Spectrum RetirementSenior living communities
  • Denver HighlandsFirst modular custom home

Free Estimate

Get a free epoxy coatings estimate in Aurora

Tell us about your Aurora project — we respond fast, and estimates are always free.

Name, phone, and email required.