autotelic.build(720) 287-7958

DESIGN · BUILD · AUTOMATE

SUPERIOR SERVICES

Control Programming in Superior

Licensed control programming services for Superior and Boulder County. One interface for everything.

What Superior requires

Code reference: These requirements align with the Town’s adoption of the 2024 International Residential Code (IRC) and related codes (with local amendments) under Chapter 18 of the Superior Municipal Code (see also Sec. 18-1-10 et seq. §18-1-10

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Control Programming

One interface for everything

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Control Programming Services in Superior, Colorado

Autotelic provides professional control programming services throughout Superior and the surrounding Boulder County area. Crestron, Savant, and Control4 programming services for unified control of lighting, A/V, shades, climate, and security. Whether you're in Superior (south Boulder County) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.

Permit Thresholds

Superior permit thresholds

Code reference
A permit is required for all types of remodels including basement finishes, structural repairs, replacement of windows, additions, decks, fences, retaining walls over 4 ft. tall, roof replacements/repairs, insulation installation (with specific guidelines), mechanical equipment (e.g., AC
Exempt work is not exhaustively listed but implied by the requirements
e.g., detached accessory structures ≤200 sq. ft. do not require a permit (only those >200 sq. ft. do).
Code reference
These requirements align with the Town’s adoption of the 2024 International Residential Code (IRC) and related codes (with local amendments) under Chapter 18 of the Superior Municipal Code (see also Sec. 18-1-10 et seq.§18-1-10
Code reference
Specific permit triggers and exemptions follow the adopted codes (typically IRC Section R105 or equivalent) as locally implemented and detailed on the town’s guidance page.§R105
Plan Review Fee
65% of the Building Permit Fee (in addition to the Building Permit Fee).
Town Use Tax
3.775% (2025) of 50% of total project valuation (materials cost assumed to be 50% of total valuation).
County Use Tax
1.335% (2026) of 50% of total project valuation (materials cost assumed to be 50% of total valuation).

Codes are amended regularly — verify current requirements with **The Town of Superior’s Building Department (operated by SAFEbuilt) issues residential building permits.

text

What this covers

User interfaces and logic for lighting, shades, AV, and climate on a residential or small-commercial processor. Typical platforms: IP control processors, keypad or app UI, and driver-level device control.

text

Technical scope

User interfaces and logic for lighting, shades, AV, and climate on a residential or small-commercial processor. Typical platforms: IP control processors, keypad or app UI, and driver-level device control. Programming follows the approved IO list; new electrical circuits are a separate trade.

text

How the work is coordinated

Programming follows the approved IO list; new electrical circuits are a separate trade. Denver-metro work is permitted locally. Colorado has no statewide general-contractor license. Cities and counties license general contractors. DORA licenses electrical and plumbing (and similar regulated trades), not general contractors. Autotelic is a municipally licensed Denver general contractor that coordinates licensed specialty trades. Denver building permits run through Community Planning and Development (CPD). Costs are project-specific; no dollar figures.

FAQ

Common questions

Who handles the control programming permits and licensing?

A municipally licensed Denver general contractor coordinates licensed specialty trades. Colorado has no statewide general-contractor license; cities and counties license general contractors. DORA licenses electrical and plumbing, not general contractors.

What is typically in scope for control programming in Denver?

User interfaces and logic for lighting, shades, AV, and climate on a residential or small-commercial processor.

When do you need drawings or a permit?

Anything that changes structure, occupancy, or regulated electrical or plumbing usually needs a local permit. Denver building permits are reviewed by Community Planning and Development. Confirm the exact trigger with CPD for the address.

Service Area

Serving Superior and Boulder County

We serve Superior, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Superior project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

Free Estimate

Get a free control programming estimate in Superior

Tell us about your Superior project — we respond fast, and estimates are always free.

Name, phone, and email required.

Verifying you're human…