(720) 287-7958

DESIGN · BUILD · AUTOMATE

SUPERIOR SERVICES

Commercial Tenant Finish in Superior

Commercial TI Walkthrough, $350

See all 2 jobs

Licensed commercial tenant finish services for Superior and Boulder County. Get your business open, on time.

What Superior requires

Code reference: These requirements align with the Town’s adoption of the 2024 International Residential Code (IRC) and related codes (with local amendments) under Chapter 18 of the Superior Municipal Code (see also Sec. 18-1-10 et seq. §18-1-10

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Commercial Tenant Finish

Get your business open, on time

Jobs you can book online

Pick your job and choose a time.

Pay when you book. We confirm within 24 hours or refund you in full.

  • Commercial Tenant-Finish Punch Visit

    $149 visit fee — credited toward the work

    GC walkthrough of a commercial space to document and price punch-list or small tenant-improvement scope, with a written proposal.

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    GC walkthrough of a commercial space to document and price punch-list or small tenant-improvement scope, with a written proposal. The $149 fee applies toward any contracted work.

  • Commercial TI Walkthrough

    A licensed GC walks your commercial space and flags code, ADA, MEP, and buildout cost drivers for your tenant improvement.

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    A licensed GC walks your commercial space and flags code, ADA, MEP, and buildout cost drivers for your tenant improvement. Includes a written summary of scope items and rough-order pricing.

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Commercial Tenant Finish Services in Superior, Colorado

Autotelic provides professional commercial tenant finish services throughout Superior and the surrounding Boulder County area. Commercial tenant improvement buildouts across the Denver metro — offices, retail, medical, and restaurant spaces with fast-track scheduling. Commercially licensed and insured. Whether you're in Superior (south Boulder County) or nearby communities, our team delivers quality workmanship, licensed and insured.

A recent build

Powersports dealership tenant finish

Parker · 2017

Delivery
Commercial tenant finish
Opened
Summer 2017
Program
Showroom · service · parts · lounge
  • High-bay showroom — stained/polished concrete, dealer-spec paint package, suspended track lighting, exposed painted structure, full-height storefront glazing with clerestory windows
  • Service department — sealed/epoxy floor, two-tone wainscot, gas unit heater, pallet racking for parts, lift-table service bays
  • Customer retail area — navy feature walls, curved reception/parts counter, customer lounge with bar-height seating
  • Full interior build — framing/drywall, high-bay HVAC with exposed spiral duct, electrical + lighting, life-safety/exits, finishes throughout

The dealership opened summer 2017 — delivered with the showroom staged with inventory and the service department in operation.

Finished high-bay showroom with polished concrete floors and powersports inventory staged
Showroom at delivery — polished concrete, dealer-spec striping, inventory staged
Showroom looking toward the full-height storefront glazing
Showroom toward the storefront glazing
Finished service department with ATVs staged on the shop floor
Service department — sealed floors, racking, and service bays in operation
Parts counter and customer lounge staged for opening
Parts counter + customer lounge
The same high-bay shell mid-finish — paint and ductwork in progress
Mid-finish — the same shell during construction

Permit Thresholds

Superior permit thresholds

Code reference
A permit is required for all types of remodels including basement finishes, structural repairs, replacement of windows, additions, decks, fences, retaining walls over 4 ft. tall, roof replacements/repairs, insulation installation (with specific guidelines), mechanical equipment (e.g., AC
Exempt work is not exhaustively listed but implied by the requirements
e.g., detached accessory structures ≤200 sq. ft. do not require a permit (only those >200 sq. ft. do).
Code reference
These requirements align with the Town’s adoption of the 2024 International Residential Code (IRC) and related codes (with local amendments) under Chapter 18 of the Superior Municipal Code (see also Sec. 18-1-10 et seq.§18-1-10
Code reference
Specific permit triggers and exemptions follow the adopted codes (typically IRC Section R105 or equivalent) as locally implemented and detailed on the town’s guidance page.§R105
Plan Review Fee
65% of the Building Permit Fee (in addition to the Building Permit Fee).
Town Use Tax
3.775% (2025) of 50% of total project valuation (materials cost assumed to be 50% of total valuation).
County Use Tax
1.335% (2026) of 50% of total project valuation (materials cost assumed to be 50% of total valuation).

Codes are amended regularly — verify current requirements with **The Town of Superior’s Building Department (operated by SAFEbuilt) issues residential building permits.

Energy Code

Superior energy code quick facts

Code reference
2024 Metro Cohort Model Code (based on the 2024 IECC), with local amendments/interpretations; Superior is in IECC Climate Zone 5B (Boulder County).
Code reference
The Town of Superior has adopted the 2024 International Building/Residential/Mechanical/Plumbing/Fire/Fuel Gas/Existing Building codes and the 2024 Metro Cohort Model Code (based on the 2024 IECC) by reference, with amendments detailed in Chapter 18 of the Superior Municipal Code (adopting ordinance
Code reference
The energy code applies to new construction, additions, and alterations (including remodels) per standard IECC scope.
Code reference
Key prescriptive requirements relevant to remodels/additions (drawn from Town reminders/interpretations and aligned with the adopted code base for CZ 5B; exact sections may reference the model code or Chapter 18 amendments):
Wall insulation
R-25 (listed under Town reminders/interpretations).
Ceiling/attic insulation
R-60 for ceilings with attic above (listed under Town reminders/interpretations).
Windows
Maximum U-factor 0.30 (listed under Town reminders/interpretations).
Air leakage
Dwelling unit air leakage test ≤ 0.16 cfm/sq ft (per IECC R402.4.1.2 testing pathway, referenced in Green Building Program points system).

Codes are amended regularly — verify current requirements with **The Town of Superior’s Building Department (operated by SAFEbuilt) issues residential building permits.

Service Area

Serving Superior and Boulder County

We serve Superior, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Superior project.

FAQ

Common questions

How much does Commercial TI Walkthrough cost in Superior?

$350.

How do I book?

Press Book next to the job, pick a date and a morning (8–12) or afternoon (12–4) window, and pay in full. We confirm within 24 hours or refund you in full.

Do you work with multi-site brands and facility programs?

Yes — we run build-outs, refresh programs, and tenant improvements for commercial clients across the Front Range, including recurring facilities work for national brands.

Who handles the permits for a tenant finish?

We do. Commercial permits are issued by the municipality where the space sits, and our team manages drawings, submittals, and inspections through sign-off.

How do you keep a build-out on schedule?

Every project runs on our own operations platform — schedule, submittals, and status updates in one system — so you get straight answers about where things stand, in minutes not days.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

Free Estimate

Get a free commercial tenant finish estimate in Superior

Tell us about your Superior project — we respond fast, and estimates are always free.

Name, phone, and email required.

Verifying you're human…