(720) 287-7958

DESIGN · BUILD · AUTOMATE

DENVER SERVICES

Acoustic Treatment in Denver

Acoustic Panel Installation (Site-Priced), $129 visit fee — credited toward the work

Licensed acoustic treatment services for Denver. Sound control for any space.

What Denver requires

Code reference: Exemptions and permit triggers align with administrative sections (e.g., analogous to IBC/IRC Section 105 or city-specific Admin provisions such as those referenced in policy documents like ADMIN 131/138). §105

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Acoustic Treatment

Sound control for any space

Book online

Pick your job and choose a time.

Pay when you book. We confirm within 24 hours or refund you in full.

  • Acoustic Panel Installation (Site-Priced)

    $129 visit fee — credited toward the work

    Placement plan and firm quote for absorption and diffusion panels in a theater or listening room; the trip fee is credited toward the installation.

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    Placement plan and firm quote for absorption and diffusion panels in a theater or listening room; the trip fee is credited toward the installation. Panel hardware is quoted in the proposal.

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Acoustic Treatment Services in Denver, Colorado

Autotelic provides professional acoustic treatment services throughout Denver and the surrounding area. Acoustic panels, sound isolation, and noise control solutions for studios, theaters, offices, and residential spaces. Whether you're in Denver (Colorado's capital city) or nearby communities, our team delivers quality workmanship, licensed and insured.

The build sequence for a Acoustic Treatment project

Every project starts with a feasibility study; this trade is priced from the same assemblies.

  1. Acoustic Treatment feasibility in Denver
  2. How a Acoustic Treatment project is estimated

Start a Acoustic Treatment feasibility study

Permits & Licensing

Permits in Denver

Building permits in Denver are issued by Community Planning and Development, and contractor licensing here is municipal — a Denver-licensed contractor pulls Denver permits. We handle permit applications and inspections as part of every project. Authority: City and County of Denver — Community Planning and Development.

Permit Thresholds

Denver permit thresholds

Code reference
Drywall patching or replacement of one sheet no larger than 4 ft by 8 ft.
Code/municipal-code references
Requirements are administered under the Denver Building and Fire Code (2025 edition, effective December 31, 2025, incorporating 2024 I-Codes with local amendments; prior editions referenced similar administrative provisions).
Code reference
Exemptions and permit triggers align with administrative sections (e.g., analogous to IBC/IRC Section 105 or city-specific Admin provisions such as those referenced in policy documents like ADMIN 131/138).§105
Code reference
Demolition has a specific reference (Denver Commercial Building Code Section 130.3 for exempted work).§130.3
There is a tiered schedule (e.g., $1–$500
$20 permit fee; higher tiers add per-$1,000 amounts with 50% plan review on many ranges); see the full table in the Development Fees policy for exact tiers.

Codes are amended regularly — verify current requirements with City and County of Denver — Community Planning and Development.

Energy Code

Denver energy code quick facts

Code reference
2021 IECC (with local Denver amendments) as adopted in the 2025 Denver Building and Fire Codes / Denver Energy Code (effective December 31, 2025); Denver Green Code (DGC) provisions may also apply to certain commercial/multifamily projects.
Code reference
Denver (Climate Zone 5B) follows the 2021 IECC base with amendments incorporated into the Denver Energy Code (DEC; residential provisions start around p.
Code reference
312 of the code document).
Code reference
The 2025 adoption explicitly incorporates the 2021 IECC for energy (distinct from the 2024 I-codes used for other building/fire provisions).
Code reference
Chapter 5 [RE] / [CE] addresses additions, alterations, repairs, and changes of occupancy to existing buildings.
Code reference
The DGC (2022, effective ~May 2023) is largely voluntary but includes mandatory elements for some larger buildings alongside Energize Denver performance standards (primarily for existing large buildings).
Code reference
Key prescriptive requirements relevant to remodels/additions (drawn from 2021 IECC Table R402.1.3 / equivalent, applicable via Chapter 5 for new envelope work unless otherwise exempted; Denver-specific checklist references confirm use of these tables or U-factor alternatives):
Ceiling/attic insulation
Minimum R-60 (Climate Zone 5).

Codes are amended regularly — verify current requirements with City and County of Denver — Community Planning and Development.

Zoning & Dimensional Standards

Setback & dimensional standards in Denver

Zone-district dimensional standards for Denver, quoted verbatim from the Denver Zoning Code. Knowing your lot's district — and its setbacks, height, and coverage limits — is where every feasibility conversation starts.

E-CC-3setback & dimensional standards
StandardRequirement
Primary Street Setback (min)0'
Side Street Setback (min)0'
Side Interior Setback (min)0'

Denver Zoning Code E-CC-3 setback standards (4.3, p.37) — effective 2010-06-25 · View the code

E-MS-2setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code E-MS-2 setback standards (4.3, p.33) — effective 2010-06-25 · View the code

E-MS-3setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code E-MS-3 setback standards (4.3, p.33) — effective 2010-06-25 · View the code

E-MS-5setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code E-MS-5 setback standards (4.3, p.33) — effective 2010-06-25 · View the code

E-MU-2.5setback & dimensional standards
StandardRequirement
Primary Street Setback (min)20'
Side Street Setback (min)5'
Side Interior Setback (min)7.5'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)45%
Zone Lot Area (min)6,000 sf
Zone Lot Width (min)50'
Height in Feet (max)30'/30'
Height in Stories (max)2.5/2.5
Bulk Plane10'/10'

Denver Zoning Code E-MU-2.5 setback standards (4.3, p.19) — effective 2010-06-25 · View the code

E-MX-2setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code E-MX-2 setback standards (4.3, p.33) — effective 2010-06-25 · View the code

E-MX-2Asetback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code E-MX-2A setback standards (4.3, p.33) — effective 2010-06-25 · View the code

E-MX-3setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code E-MX-3 setback standards (4.3, p.33) — effective 2010-06-25 · View the code

E-MX-3Asetback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code E-MX-3A setback standards (4.3, p.33) — effective 2010-06-25 · View the code

E-MX-Esetback & dimensional standards
StandardRequirement
Primary Street Setback (min)40% E-MS: 60%
Side Street Setback (min)25%

Denver Zoning Code E-MX-E setback standards (4.3, p.39) — effective 2010-06-25 · View the code

E-RH-2.5setback & dimensional standards
StandardRequirement
Primary Street Setback (min)20'
Side Street Setback (min)5'
Side Interior Setback (min)7.5'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)45%
Zone Lot Area (min)6,000 sf
Zone Lot Width (min)50'
Height in Feet (max)30'/30'
Height in Stories (max)2.5/2.5
Bulk Plane10'/10'

Denver Zoning Code E-RH-2.5 setback standards (4.3, p.19) — effective 2010-06-25 · View the code

E-RX-3setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code E-RX-3 setback standards (4.3, p.33) — effective 2010-06-25 · View the code

E-RX-5setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code E-RX-5 setback standards (4.3, p.33) — effective 2010-06-25 · View the code

E-SU-Asetback & dimensional standards
StandardRequirement
Primary Street Setback (min)20'
Rear Setback where no alley (min)Not in our sourced tables for this municipality — we confirm with the city.
Rear Setback where alley abuts (min)Not in our sourced tables for this municipality — we confirm with the city.
Building Coverage (max)45%
Zone Lot Area (min)3,000 sf
Zone Lot Width (min)25'
Height in Feet (max)30'/17'
Height in Stories (max)2.5/1
Bulk Plane17'/10'

Denver Zoning Code E-SU-A setback standards (4.3, p.21) — effective 2010-06-25 · View the code

E-SU-Bsetback & dimensional standards
StandardRequirement
Primary Street Setback (min)20'
Rear Setback where no alley (min)Not in our sourced tables for this municipality — we confirm with the city.
Rear Setback where alley abuts (min)Not in our sourced tables for this municipality — we confirm with the city.
Zone Lot Area (min)4,500 sf
Zone Lot Width (min)35'
Height in Feet (max)30'/17'
Height in Stories (max)2.5/1
Bulk Plane17'/10'

Denver Zoning Code E-SU-B setback standards (4.3, p.21) — effective 2010-06-25 · View the code

E-SU-Dsetback & dimensional standards
StandardRequirement
Primary Street Setback (min)20'
Side Street Setback (min)5'
Side Interior Setback (min)5'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)45%
Zone Lot Area (min)6,000 sf
Zone Lot Width (min)50'
Height in Feet (max)30'/30'
Height in Stories (max)2.5/2.5
Bulk Plane10'/10'

Denver Zoning Code E-SU-D setback standards (4.3, p.19) — effective 2010-06-25 · View the code

E-SU-Gsetback & dimensional standards
StandardRequirement
Primary Street Setback (min)20'
Rear Setback where no alley (min)Not in our sourced tables for this municipality — we confirm with the city.
Rear Setback where alley abuts (min)Not in our sourced tables for this municipality — we confirm with the city.
Building Coverage (max)45%
Zone Lot Area (min)9,000 sf
Zone Lot Width (min)62.5'
Height in Feet (max)30'/30'
Height in Stories (max)2.5/2.5
Bulk Plane10'/10'

Denver Zoning Code E-SU-G setback standards (4.3, p.19) — effective 2010-06-25 · View the code

E-TU-Bsetback & dimensional standards
StandardRequirement
Primary Street Setback (min)20'
Side Street Setback (min)3'
Side Interior Setback (min)3'
Rear Setback where no alley (min)Not in our sourced tables for this municipality — we confirm with the city.
Rear Setback where alley abuts (min)Not in our sourced tables for this municipality — we confirm with the city.
Building Coverage (max)45%
Zone Lot Area (min)4,500 sf
Zone Lot Width (min)35'
Height in Feet (max)30'/17'
Height in Stories (max)2.5/1
Bulk Plane17'/10'

Denver Zoning Code E-TU-B setback standards (4.3, p.21) — effective 2010-06-25 · View the code

E-TU-Csetback & dimensional standards
StandardRequirement
Primary Street Setback (min)20'
Side Street Setback (min)5'
Side Interior Setback (min)3' min one side/ 10' min combined
Rear Setback where no alley (min)Not in our sourced tables for this municipality — we confirm with the city.
Rear Setback where alley abuts (min)Not in our sourced tables for this municipality — we confirm with the city.
Building Coverage (max)45%
Zone Lot Area (min)5,500 sf
Zone Lot Width (min)50'
Height in Feet (max)30'/17'
Height in Stories (max)2.5/1
Bulk Plane17'/10'

Denver Zoning Code E-TU-C setback standards (4.3, p.21) — effective 2010-06-25 · View the code

G-MS-3setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code G-MS-3 setback standards (6.3, p.27) — effective 2010-06-25 · View the code

G-MS-5setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code G-MS-5 setback standards (6.3, p.27) — effective 2010-06-25 · View the code

G-MU-12setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)5'
Side Interior Setback (min)7.5'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)10'
Zone Lot Area (min)6,000 sf
Zone Lot Width (min)50'

Denver Zoning Code G-MU-12 setback standards (6.3, p.29) — effective 2010-06-25 · View the code

G-MU-20setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)5'
Side Interior Setback (min)7.5'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)10'
Zone Lot Area (min)6,000 sf
Zone Lot Width (min)50'

Denver Zoning Code G-MU-20 setback standards (6.3, p.29) — effective 2010-06-25 · View the code

G-MU-3setback & dimensional standards
StandardRequirement
Primary Street Setback (min)20'
Side Street Setback (min)5'
Side Interior Setback (min)3' min one side/10' min combined
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)45%
Zone Lot Area (min)3,000 sf
Zone Lot Width (min)25'

Denver Zoning Code G-MU-3 setback standards (6.3, p.17) — effective 2010-06-25 · View the code

G-MU-5setback & dimensional standards
StandardRequirement
Primary Street Setback (min)20'
Side Street Setback (min)5'
Side Interior Setback (min)5'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)45%
Zone Lot Area (min)3,000 sf
Zone Lot Width (min)25'

Denver Zoning Code G-MU-5 setback standards (6.3, p.17) — effective 2010-06-25 · View the code

G-MU-8setback & dimensional standards
StandardRequirement
Primary Street Setback (min)20'
Side Street Setback (min)5'
Side Interior Setback (min)7.5'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)40%
Zone Lot Area (min)3,000 sf
Zone Lot Width (min)25'

Denver Zoning Code G-MU-8 setback standards (6.3, p.17) — effective 2010-06-25 · View the code

G-MX-3setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code G-MX-3 setback standards (6.3, p.27) — effective 2010-06-25 · View the code

G-RH-3setback & dimensional standards
StandardRequirement
Primary Street Setback (min)20'
Side Street Setback (min)15'
Side Interior Setback (min)3'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)60%
Zone Lot Area (min)3,000 sf
Zone Lot Width (min)25'
Bulk Plane12'

Denver Zoning Code G-RH-3 setback standards (6.3, p.17) — effective 2010-06-25 · View the code

G-RO-3setback & dimensional standards
StandardRequirement
Primary Street Setback (min)20'
Side Street Setback (min)5'
Side Interior Setback (min)3' min one side/10' min combined
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)45%
Zone Lot Area (min)3,000 sf
Zone Lot Width (min)25'

Denver Zoning Code G-RO-3 setback standards (6.3, p.17) — effective 2010-06-25 · View the code

G-RO-5setback & dimensional standards
StandardRequirement
Primary Street Setback (min)20'
Side Street Setback (min)5'
Side Interior Setback (min)5'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)45%
Zone Lot Area (min)3,000 sf
Zone Lot Width (min)25'

Denver Zoning Code G-RO-5 setback standards (6.3, p.17) — effective 2010-06-25 · View the code

G-RX-3setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code G-RX-3 setback standards (6.3, p.27) — effective 2010-06-25 · View the code

G-RX-5setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code G-RX-5 setback standards (6.3, p.27) — effective 2010-06-25 · View the code

S-CC-3setback & dimensional standards
StandardRequirement
Primary Street Setback (min)0'
Side Street Setback (min)0'
Side Interior Setback (min)0'

Denver Zoning Code S-CC-3 setback standards (3.3, p.29) — effective 2010-06-25 · View the code

S-CC-5setback & dimensional standards
StandardRequirement
Primary Street Setback (min)0'
Side Street Setback (min)0'
Side Interior Setback (min)5'

Denver Zoning Code S-CC-5 setback standards (3.3, p.33) — effective 2010-06-25 · View the code

S-MS-3setback & dimensional standards
StandardRequirement
Primary Street Setback (min)0'
Side Street Setback (min)0'
Side Interior Setback (min)0'

Denver Zoning Code S-MS-3 setback standards (3.3, p.29) — effective 2010-06-25 · View the code

S-MU-3setback & dimensional standards
StandardRequirement
Primary Street Setback (min)13.1.5.9 or 20' , whichever
Side Street Setback (min)5'
Side Interior Setback (min)5'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)50%
Zone Lot Area (min)4,500 sf
Zone Lot Width (min)37.5'
Height in Feet (max)32'/32'
Height in Stories (max)3/3

Denver Zoning Code S-MU-3 setback standards (3.3, p.21) — effective 2010-06-25 · View the code

S-MX-12setback & dimensional standards
StandardRequirement
Primary Street Setback (min)20' 20'/25'
Side Interior Setback (min)Not in our sourced tables for this municipality — we confirm with the city.

Denver Zoning Code S-MX-12 setback standards (3.3, p.39) — effective 2010-06-25 · View the code

S-MX-12Asetback & dimensional standards
StandardRequirement
Primary Street Setback (min)20' 20'/25'
Side Interior Setback (min)Not in our sourced tables for this municipality — we confirm with the city.

Denver Zoning Code S-MX-12A setback standards (3.3, p.39) — effective 2010-06-25 · View the code

S-MX-2setback & dimensional standards
StandardRequirement
Primary Street Setback (min)0'
Side Street Setback (min)0'
Side Interior Setback (min)0'

Denver Zoning Code S-MX-2 setback standards (3.3, p.29) — effective 2010-06-25 · View the code

S-MX-2Asetback & dimensional standards
StandardRequirement
Primary Street Setback (min)40% Residential Only Buildings: 30%
Side Street Setback (min)25%
Side Interior Setback (min)0'

Denver Zoning Code S-MX-2A setback standards (3.3, p.37) — effective 2010-06-25 · View the code

S-MX-3setback & dimensional standards
StandardRequirement
Primary Street Setback (min)0'
Side Street Setback (min)0'
Side Interior Setback (min)0'

Denver Zoning Code S-MX-3 setback standards (3.3, p.31) — effective 2010-06-25 · View the code

S-MX-3Asetback & dimensional standards
StandardRequirement
Primary Street Setback (min)15'

Denver Zoning Code S-MX-3A setback standards (3.3, p.39) — effective 2010-06-25 · View the code

S-MX-5setback & dimensional standards
StandardRequirement
Primary Street Setback (min)20'
Side Interior Setback (min)Not in our sourced tables for this municipality — we confirm with the city.

Denver Zoning Code S-MX-5 setback standards (3.3, p.39) — effective 2010-06-25 · View the code

S-MX-5Asetback & dimensional standards
StandardRequirement
Primary Street Setback (min)20'
Side Interior Setback (min)Not in our sourced tables for this municipality — we confirm with the city.

Denver Zoning Code S-MX-5A setback standards (3.3, p.39) — effective 2010-06-25 · View the code

S-MX-8Asetback & dimensional standards
StandardRequirement
Primary Street Setback (min)20'

Denver Zoning Code S-MX-8A setback standards (3.3, p.39) — effective 2010-06-25 · View the code

S-RH-2.5setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)5'
Side Interior Setback (min)5'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)50%
Zone Lot Area (min)4,500 sf
Zone Lot Width (min)37.5'
Height in Feet (max)30'/30'
Height in Stories (max)2.5/2.5
Bulk Plane10'/10'

Denver Zoning Code S-RH-2.5 setback standards (3.3, p.21) — effective 2010-06-25 · View the code

S-SU-Asetback & dimensional standards
StandardRequirement
Side Interior Setback (min)3' 5'
Rear Setback where alley abuts (min)12'
Building Coverage (max)50%
Zone Lot Area (min)3,000 sf
Zone Lot Width (min)25'
Height in Feet (max)30'/30'
Height in Stories (max)2.5/2.5
Bulk Plane10'/10'

Denver Zoning Code S-SU-A setback standards (3.3, p.19) — effective 2010-06-25 · View the code

S-SU-FAsetback & dimensional standards
StandardRequirement
Primary Street Setback (min)10' 5'/15'
Side Interior Setback (min)5'/15'
Rear Setback where alley abuts (min)12'
Building Coverage (max)50%
Zone Lot Area (min)8,500 sf
Zone Lot Width (min)62.5'
Height in Feet (max)30'/30'
Height in Stories (max)2.5/2.5
Bulk Plane10'

Denver Zoning Code S-SU-FA setback standards (3.3, p.19) — effective 2010-06-25 · View the code

S-SU-Isetback & dimensional standards
StandardRequirement
Side Street Setback (min)5'
Zone Lot Area (min)12,000 sf
Zone Lot Width (min)62.5'
Height in Feet (max)30'/30'
Height in Stories (max)3/3
Bulk Plane10'/10' 10'/10'

Denver Zoning Code S-SU-I setback standards (3.3, p.19) — effective 2010-06-25 · View the code

U-MS-2setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code U-MS-2 setback standards (5.3, p.27) — effective 2010-06-25 · View the code

U-MS-3setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code U-MS-3 setback standards (5.3, p.27) — effective 2010-06-25 · View the code

U-MS-5setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code U-MS-5 setback standards (5.3, p.27) — effective 2010-06-25 · View the code

U-MX-2setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code U-MX-2 setback standards (5.3, p.27) — effective 2010-06-25 · View the code

U-MX-3setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code U-MX-3 setback standards (5.3, p.27) — effective 2010-06-25 · View the code

U-RH-2.5setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)10'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)40%
Zone Lot Area (min)3,000 sf
Zone Lot Width (min)25'
Height in Feet (max)30'/17'
Height in Stories (max)2.5/1
Bulk Plane17'/10'

Denver Zoning Code U-RH-2.5 setback standards (5.3, p.19) — effective 2010-06-25 · View the code

U-RH-3Asetback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)10'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)40%
Zone Lot Area (min)3,000 sf
Zone Lot Width (min)25'
Height in Feet (max)30'/17'
Height in Stories (max)2.5/1
Bulk Plane17'/10'

Denver Zoning Code U-RH-3A setback standards (5.3, p.19) — effective 2010-06-25 · View the code

U-RX-3setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code U-RX-3 setback standards (5.3, p.27) — effective 2010-06-25 · View the code

U-RX-5setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code U-RX-5 setback standards (5.3, p.27) — effective 2010-06-25 · View the code

U-SU-Asetback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)3'
Side Interior Setback (min)3'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)60%
Zone Lot Area (min)3,000 sf
Zone Lot Width (min)25'
Height in Feet (max)30'/17'
Height in Stories (max)2.5/1
Bulk Plane17'/10'

Denver Zoning Code U-SU-A setback standards (5.3, p.19) — effective 2010-06-25 · View the code

U-SU-A2setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)3'
Side Interior Setback (min)3'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)60%
Zone Lot Area (min)3,000 sf
Zone Lot Width (min)25'
Height in Feet (max)30'/17'
Height in Stories (max)2.5/1
Bulk Plane17'/10'

Denver Zoning Code U-SU-A2 setback standards (5.3, p.19) — effective 2010-06-25 · View the code

U-SU-Bsetback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Zone Lot Area (min)4,500 sf
Zone Lot Width (min)35'
Height in Feet (max)30'/17'
Height in Stories (max)2.5/1
Bulk Plane17'/10'

Denver Zoning Code U-SU-B setback standards (5.3, p.19) — effective 2010-06-25 · View the code

U-SU-B2setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)3'
Side Interior Setback (min)3'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)60%
Zone Lot Area (min)4,500 sf
Zone Lot Width (min)35'
Height in Feet (max)30'/17'
Height in Stories (max)2.5/1
Bulk Plane17'/10'

Denver Zoning Code U-SU-B2 setback standards (5.3, p.19) — effective 2010-06-25 · View the code

U-SU-Csetback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Interior Setback (min)3' min one 10' min combined
Zone Lot Area (min)5,500 sf
Zone Lot Width (min)50'
Height in Feet (max)30'/17'
Height in Stories (max)2.5/1
Bulk Plane17'/10'

Denver Zoning Code U-SU-C setback standards (5.3, p.19) — effective 2010-06-25 · View the code

U-SU-C2setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)3'
Side Interior Setback (min)3' min one 10' min combined
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)60%
Zone Lot Area (min)5,500 sf
Zone Lot Width (min)50'
Height in Feet (max)30'/17'
Height in Stories (max)2.5/1
Bulk Plane17'/10'

Denver Zoning Code U-SU-C2 setback standards (5.3, p.19) — effective 2010-06-25 · View the code

U-SU-Esetback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)5'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)45%
Zone Lot Area (min)7,000 sf
Zone Lot Width (min)50'
Height in Feet (max)30'/17'
Height in Stories (max)2.5/1
Bulk Plane17'/10'

Denver Zoning Code U-SU-E setback standards (5.3, p.19) — effective 2010-06-25 · View the code

U-SU-Hsetback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)5'
Side Interior Setback (min)5'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)45%
Zone Lot Area (min)10,000 sf
Zone Lot Width (min)75'
Height in Feet (max)30'/17'
Height in Stories (max)3/1
Bulk Plane17'/10'

Denver Zoning Code U-SU-H setback standards (5.3, p.19) — effective 2010-06-25 · View the code

U-TU-Bsetback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)3'
Side Interior Setback (min)3'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)60%
Zone Lot Area (min)3,000 sf
Zone Lot Width (min)25'
Height in Feet (max)30'/17'
Height in Stories (max)2.5/1
Bulk Plane17'/10'

Denver Zoning Code U-TU-B setback standards (5.3, p.19) — effective 2010-06-25 · View the code

U-TU-B2setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)3'
Side Interior Setback (min)3'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)60%
Zone Lot Area (min)3,000 sf
Zone Lot Width (min)25'
Height in Feet (max)30'/17'
Height in Stories (max)2.5/1
Bulk Plane17'/10'

Denver Zoning Code U-TU-B2 setback standards (5.3, p.19) — effective 2010-06-25 · View the code

U-TU-Csetback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)5'
Side Interior Setback (min)10'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)40%
Zone Lot Area (min)4,500 sf
Zone Lot Width (min)35'
Height in Feet (max)30'/17'
Height in Stories (max)2.5/1
Bulk Plane17'/10'

Denver Zoning Code U-TU-C setback standards (5.3, p.19) — effective 2010-06-25 · View the code

Verify current requirements with the jurisdiction — informational reference only. Standards vary by overlay, lot, and use; we confirm the exact rules for your property during feasibility.

text

What this covers

Absorption, diffusion, and isolation treatments for rooms that need speech or music control. Scope is material and placement against an existing assembly, not a new structural design.

text

How the work is coordinated

Field measure first; treatments follow the existing wall, ceiling, and door conditions. Denver-metro work is permitted locally. Colorado has no statewide general-contractor license. Cities and counties license general contractors. DORA licenses electrical and plumbing (and similar regulated trades), not general contractors. Autotelic is a municipally licensed Denver general contractor that coordinates licensed specialty trades. Denver building permits run through Community Planning and Development (CPD). Costs are project-specific; no dollar figures.

FAQ

Common questions

How much does Acoustic Panel Installation (Site-Priced) cost in Denver?

$129 visit fee — credited toward the work.

How do I book?

Press Book next to the job, pick a date and a morning (8–12) or afternoon (12–4) window, and pay in full. We confirm within 24 hours or refund you in full.

Who handles the acoustic treatment permits and licensing?

A municipally licensed Denver general contractor coordinates licensed specialty trades. Colorado has no statewide general-contractor license; cities and counties license general contractors. DORA licenses electrical and plumbing, not general contractors.

What is typically in scope for acoustic treatment in Denver?

Absorption, diffusion, and isolation treatments for rooms that need speech or music control.

When do you need drawings or a permit?

Anything that changes structure, occupancy, or regulated electrical or plumbing usually needs a local permit. Denver building permits are reviewed by Community Planning and Development. Confirm the exact trigger with CPD for the address.

Service Area

Serving Denver

We serve Denver, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Denver project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

Free Estimate

Get a free acoustic treatment estimate in Denver

Tell us about your Denver project — we respond fast, and estimates are always free.

Name, phone, and email required.

Verifying you're human…