autotelic.build(720) 287-7958

DESIGN · BUILD · AUTOMATE

GOLDEN SERVICES

Whole-Home Renovation in Golden

Whole-Home Renovation Design Consultation, $350

See all 2 jobs

Licensed whole-home renovation services for Golden and Jefferson County. Reinvent every room in your home.

What Golden requires

ADUs are permitted in the following residential zone districts in conjunction wi: R-E, R-1, R-1A, R-2, and R-3 (Municipal Code § 18.28.240; city ADU page). § 18.28.240

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Whole-Home Renovation

Reinvent every room in your home

Jobs you can book online

Pick your job and choose a time.

Pay when you book. We confirm within 24 hours or refund you in full.

  • Pre-Purchase Renovation Walkthrough + Report

    A contractor's walkthrough of a home you're buying, focused on what your planned renovation will actually cost and what will fight you.

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    A contractor's walkthrough of a home you're buying, focused on what your planned renovation will actually cost and what will fight you. Includes a written report with itemized budget ranges.

  • Whole-Home Renovation Design Consultation

    A two-hour walkthrough of the full house to prioritize scope, phasing, and budget across rooms.

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    A two-hour walkthrough of the full house to prioritize scope, phasing, and budget across rooms. You receive a written room-by-room scope outline with cost ranges.

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Whole-Home Renovation Services in Golden, Colorado

Autotelic provides professional whole-home renovation services throughout Golden and the surrounding Jefferson County area. Comprehensive whole-home renovations across the Denver metro coordinating every trade from demo through finish with integrated smart home automation. Whether you're in Golden (gateway to the mountains) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.

Permit Thresholds

Golden permit thresholds

Code reference
Building Permit Fees table (effective 05/01/11, as modified by resolutions).
Exterior
One-story detached accessory structures ≤200 sq ft (residential only); fences ≤7 ft tall (unless front yard, corner lot, or historic district); landscaping; minor roof or siding repairs/replacement (10% or less of total area); minor maintenance/repairs; painting; retaining/landscape walls ≤4 ft tall
Code reference
Retaining/landscape walls over 4 ft (or supporting surcharge) also trigger requirements, often needing engineering.
For homeowners doing their own work
materials cost × 2.
Building permit fees are calculated from a tiered table based on total valuation
$1–$500 = $25.85; higher tiers add per-$100 or per-$1,000 increments up to $1M+).
Additional plan review fee (when applicable)
65% of the permit fee.
Building use tax
3% use tax on building materials, stated as 1.5% of total valuation.

Codes are amended regularly — verify current requirements with **The City of Golden (specifically its Building Division/Building Department) issues residential building permits for properties within Golden city limits.

Zoning & ADU

Golden zoning & ADU quick facts

ADUs are permitted in the following residential zone districts in conjunction wi
R-E, R-1, R-1A, R-2, and R-3 (Municipal Code § 18.28.240; city ADU page).§ 18.28.240
Code reference
Lot coverage of all accessory structures must not exceed 10% of the lot area (§ 18.28.240).§ 18.28.240
Code reference
Specific numeric standards for max lot coverage %, max building height, ADU max size, and setbacks for the listed districts (or any form types within them) are not detailed in publicly available summaries of the code or related documents without direct access to the full current Municipal Code Title
Code reference
One reference notes aggregate total lot coverage limits applying to structures in RE, R-1, and R-1A districts, but the exact percentage is not specified in available sources.
Code reference
For precise, current standards, consult the full Golden Municipal Code (library.municode.com/co/golden/codes/municipal_code, Title 18) or contact the city, as the zoning code has undergone form-based updates.

Codes are amended regularly — verify current requirements with **The City of Golden (specifically its Building Division/Building Department) issues residential building permits for properties within Golden city limits.

A recent build

Full-home remodel after a burst pipe

Denver metro

Trigger
Burst waterline → insurance claim
Structure
Bearing wall out, flush beam in
Master bath
Curbless wet room, tub-in-shower
Result
Sold at a profit at resale
  • Insurance-claim restoration folded into a full remodel design
  • Kitchen remodel opening to the dining space
  • Living/dining bearing wall removed — flush beam, no soffit
  • Master bath expanded into a curbless wet room — shower and soaking tub in one glass enclosure
  • Second full bath remodeled
  • New flooring throughout the home

A burst waterline flooded the home while the owners were away, triggering an insurance claim for floors and drywall. Rather than a like-for-like patch, the claim was folded into a full remodel — kitchen, two baths, a bearing wall removed for an open living/dining plan, a curbless wet-room master bath, and new floors throughout. The owners invested beyond the claim, and the home sold at a profit a few years later.

Dining and living as one open space after the bearing wall came out
Living room opening to the sunroom bar
White kitchen island under the vaulted window wall
New flooring running through the main level
Master bath wet room — glass enclosure with marble shower
Second bath with patterned tile and navy vanity

Energy Code

Golden energy code quick facts

Code reference
2024 International Energy Conservation Code (IECC), adopted by the City of Golden with no energy-specific local amendments noted beyond the base code (and state electric-ready/solar-ready provisions where applicable).
Code reference
Golden (Jefferson County, climate zone 5B) lists the 2024 IECC among its adopted codes on the official Building Permit Process page.
Code reference
Adoption aligns with the city’s update to the 2024 I-Codes suite (effective after the July 22, 2025 council action referenced in related materials).
Code reference
The code applies to new construction, additions, and remodels/alterations as scoped in the IECC/IRC.
Code reference
Key prescriptive requirements (2024 IECC residential provisions, Table R402.1.2 / R402.1.3 and related sections, climate zone 5 / 5B; relevant to additions and remodels where the thermal envelope or systems are altered):
Ceiling/attic insulation
Minimum R-49 (or equivalent U-factor).
Code reference
(2024 IECC Table R402.1.3 / IRC N1102.1.3; note reduction from prior editions.)
Wood-frame wall insulation
R-20 + R-5 ci, or R-13 + R-10 ci, or R-0 + R-20 ci (or equivalent U-factor options).

Codes are amended regularly — verify current requirements with **The City of Golden (specifically its Building Division/Building Department) issues residential building permits for properties within Golden city limits.

text

What this covers

Phased renovation of most rooms in an existing Denver house. Structure, MEP, and finishes are sequenced so the house can stay partly occupied when the brief requires it.

text

How the work is coordinated

A municipally licensed Denver general contractor coordinates licensed specialty trades. Denver-metro work is permitted locally. Colorado has no statewide general-contractor license. Cities and counties license general contractors. DORA licenses electrical and plumbing (and similar regulated trades), not general contractors. Autotelic is a municipally licensed Denver general contractor that coordinates licensed specialty trades. Denver building permits run through Community Planning and Development (CPD). Costs are project-specific; no dollar figures.

FAQ

Common questions

How much does Pre-Purchase Renovation Walkthrough + Report cost in Golden?

$475.

How do I book?

Press Book next to the job, pick a date and a morning (8–12) or afternoon (12–4) window, and pay in full. We confirm within 24 hours or refund you in full.

Who handles the whole-home renovation permits and licensing?

A municipally licensed Denver general contractor coordinates licensed specialty trades. Colorado has no statewide general-contractor license; cities and counties license general contractors. DORA licenses electrical and plumbing, not general contractors.

What is typically in scope for whole-home renovation in Denver?

Phased renovation of most rooms in an existing Denver house.

When do you need drawings or a permit?

Anything that changes structure, occupancy, or regulated electrical or plumbing usually needs a local permit. Denver building permits are reviewed by Community Planning and Development. Confirm the exact trigger with CPD for the address.

Service Area

Serving Golden and Jefferson County

We serve Golden, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Golden project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

Let's design your perfect Whole-Home Renovation together

Get a personalized estimate in about 2 minutes — no pressure, no obligation.

Licensed & Insured ContractorVeteran-Owned

How This Works (2 minutes)

  1. 1Tell us about your project (30 seconds)
  2. 2Answer a few quick questions for an accurate estimate (60 seconds)
  3. 3Get your personalized estimate instantly (30 seconds)

No pressure. No obligation. No spam calls. If we're not the right fit, we'll tell you — and even recommend someone who is.