(720) 287-7958

DESIGN · BUILD · AUTOMATE

BOULDER SERVICES

Solar Panel Array in Boulder

Solar Consultation & Site Assessment$149

See all 2 jobs

Licensed solar panel array services for Boulder and Boulder County. Harness Colorado's 300 days of sun.

What Boulder requires

Exempt work (no permit required, though work must still comply with all applicab: The complete list is referenced in Boulder Revised Code (B.R.C.) 1981, Title 10, Chapter 5, Section 10-5-2 (Adoption of International Building Code with Modifications, including exemptions in section J). §10-5-2

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Solar Panel Array

Harness Colorado's 300 days of sun

Jobs you can book online

Pick your job and choose a time.

Pay when you book. We confirm within 24 hours or refund you in full.

  • Solar Consultation & Site Assessment

    On-site assessment of roof orientation, shading, structural condition, and electrical service, with a usage review and a written production-and-cost estimate for a solar installation.

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    On-site assessment of roof orientation, shading, structural condition, and electrical service, with a usage review and a written production-and-cost estimate for a solar installation. System design engineering, permitting, and installation are not included.

  • Home Battery / Energy Storage Assessment

    Evaluation of backup power needs — critical loads, panel configuration, placement options, and solar pairing — delivered as a written sizing recommendation with firm installation pricing.

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    Evaluation of backup power needs — critical loads, panel configuration, placement options, and solar pairing — delivered as a written sizing recommendation with firm installation pricing. Battery hardware and installation labor are not included.

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Solar Panel Array Services in Boulder, Colorado

Autotelic provides professional solar panel array services throughout Boulder and the surrounding Boulder County area. Solar panel installation across the Denver metro — rooftop and ground-mount arrays with microinverters, monitoring, and Xcel Energy net metering. Whether you're in Boulder (home to CU Boulder) or nearby communities, our team delivers quality workmanship, licensed and insured.

Permit Thresholds

Boulder permit thresholds

Exempt work (no permit required, though work must still comply with all applicab
The complete list is referenced in Boulder Revised Code (B.R.C.) 1981, Title 10, Chapter 5, Section 10-5-2 (Adoption of International Building Code with Modifications, including exemptions in section J).§10-5-2
Code reference
Minor drywall repairs (<1 sheet or 32 sq ft).
Code reference
One-story accessory sheds (≤120 sq ft, ≤10 ft high, no utilities/electrical/mechanical/plumbing).
Code reference
Fences ≤7 ft high.
Code reference
Flatwork (private sidewalks, patios, driveways) ≤30 inches above grade, not over a basement/story below, and not part of an accessible route.
Code reference
Playground equipment accessory to 1- or 2-family dwellings.
Code reference
Prefabricated above-ground swimming pools accessory to 1- or 2-family dwellings (<24 inches deep, ≤5,000 gallons).
Code reference
Retaining walls ≤3 ft high (measured from footing bottom to wall top), unless supporting a surcharge or impounding certain flammables.

Codes are amended regularly — verify current requirements with **City of Boulder Planning and Development Services (P&DS; specifically its Building Permits and Inspections section) issues residential building permits for properties within Boulder city limits.

Energy Code

Boulder energy code quick facts

Code reference
2024 City of Boulder Energy Conservation Code (CoBECC), effective December 1, 2024 (based on the 2024 ICC suite of codes with local amendments; all-electric requirements for new construction, additions, and major alterations).
Code reference
This applies to the City of Boulder (not unincorporated Boulder County, which follows the 2021 IECC with amendments effective July 1, 2026).
Code reference
The code emphasizes performance paths (e.g., ERI/HERS targets) for most projects but retains prescriptive options for smaller additions/remodels (≤1,000 sf for residential).
Code reference
Boulder is in Climate Zone 5B.
Code reference
Prescriptive requirements align closely with or reference 2024 IECC Table R402.1.2 (and related sections R401–R404, R407–R408) unless locally amended; projects often use performance paths due to stringency.
Code reference
Key prescriptive requirements relevant to remodels/additions (from CoBECC/2024 IECC Table R402.1.2 and related sections for CZ 5B; cite the adopting code section or CoBECC equivalent):
Ceiling/attic insulation
R-49 minimum (R402.1.2 / CoBECC Chapter 4 RE).
Wood-frame above-grade walls
R-20 + R-5 continuous insulation (ci), or R-13 + R-10 ci, or R-20 ci (R402.1.2 / CoBECC Chapter 4 RE).

Codes are amended regularly — verify current requirements with **City of Boulder Planning and Development Services (P&DS; specifically its Building Permits and Inspections section) issues residential building permits for properties within Boulder city limits.

Zoning & Dimensional Standards

Setback & dimensional standards in Boulder

Zone-district dimensional standards for Boulder, quoted verbatim from the Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026). Knowing your lot's district — and its setbacks, height, and coverage limits — is where every feasibility conversation starts.

Asetback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)15'
Side Setback Abutting Street (min)25'
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) A setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

BCsetback & dimensional standards
BCSsetback & dimensional standards
BMSsetback & dimensional standards
BRsetback & dimensional standards
BT-1setback & dimensional standards
BT-2setback & dimensional standards
DT-1setback & dimensional standards
DT-2setback & dimensional standards
DT-3setback & dimensional standards
DT-4setback & dimensional standards
DT-5setback & dimensional standards
IGsetback & dimensional standards
IMsetback & dimensional standards
IMSsetback & dimensional standards
IS-1setback & dimensional standards
IS-2setback & dimensional standards
MHsetback & dimensional standards
MU-1setback & dimensional standards
MU-2setback & dimensional standards
MU-3setback & dimensional standards
MU-4setback & dimensional standards
Psetback & dimensional standards
REsetback & dimensional standards
RH-1setback & dimensional standards
RH-2setback & dimensional standards
RH-3setback & dimensional standards
RH-4setback & dimensional standards
RH-5setback & dimensional standards
RH-6setback & dimensional standards
RH-7setback & dimensional standards
RL-1setback & dimensional standards
RL-2setback & dimensional standards
RM-1setback & dimensional standards
RM-2setback & dimensional standards
RM-3setback & dimensional standards
RMX-1setback & dimensional standards
RMX-2setback & dimensional standards
RR-1setback & dimensional standards
RR-2setback & dimensional standards

Verify current requirements with the jurisdiction — informational reference only. Standards vary by overlay, lot, and use; we confirm the exact rules for your property during feasibility.

text

What this covers

Rooftop or ground PV array, racking, and inverter or microinverters. Interconnection and structural review are required; electrical work is a DORA-licensed specialty.

text

Technical scope

Rooftop or ground PV array, racking, and inverter or microinverters. Interconnection and structural review are required; electrical work is a DORA-licensed specialty. Production estimates come from a site-specific design.

FAQ

Common questions

How much does Solar Consultation & Site Assessment cost in Boulder?

$149.

How do I book?

Press Book next to the job, pick a date and a morning (8–12) or afternoon (12–4) window, and pay in full. We confirm within 24 hours or refund you in full.

What's not included?

System design engineering, permitting, and installation are not included.

Who handles the solar panel array permits and licensing?

A municipally licensed Denver general contractor coordinates licensed specialty trades. Colorado has no statewide general-contractor license; cities and counties license general contractors. DORA licenses electrical and plumbing, not general contractors.

What is typically in scope for solar panel array in Denver?

Rooftop or ground PV array, racking, and inverter or microinverters.

Service Area

Serving Boulder and Boulder County

We serve Boulder, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Boulder project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

Free Estimate

Get a free solar panel array estimate in Boulder

Tell us about your Boulder project — we respond fast, and estimates are always free.

Name, phone, and email required.

Verifying you're human…