autotelic.build(720) 287-7958

DESIGN · BUILD · AUTOMATE

AURORA SERVICES

Security Camera Systems — PoE in Aurora

Licensed security camera systems — PoE services for Aurora and Arapahoe/Adams County. Commercial-grade surveillance for any property.

  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Security Camera Systems — PoE

Commercial-grade surveillance for any property

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Security Camera Systems — PoE Services in Aurora, Colorado

Autotelic provides professional security camera systems — PoE services throughout Aurora and the surrounding Arapahoe/Adams County area. PoE security camera installation across the Denver metro — 4K IP cameras, NVR recording, structured wiring, remote app access, and AI analytics. Whether you're in Aurora (Colorado's third-largest city) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.

Permits & Licensing

Permits in Aurora

Aurora building permits are issued by the Building Division's Permit Center, which also handles public improvement, sign, and lawn and irrigation permits. Contractor licensing is a City of Aurora requirement, and applications go through the Aurora4Biz.org online portal. Authority: City of Aurora — Building Division (Permit Center).

Permit Thresholds

Aurora permit thresholds

Code reference
Permits are generally required for residential remodel work in Aurora, Colorado, per the adopted building codes (primarily the 2021 International Residential Code (IRC) with local amendments in Aurora City Code Chapter 22, Article V), unless specifically exempt.
Aurora City Code § 22-184 (amending IRC R105.2) exempts only
one-story detached accessory residential storage sheds, playhouses, or shade structures ≤120 sq ft, not attached to the residence, and not used for vehicle storage.§ 22-184
Code reference
Aurora City Code § 22-135 (amending IBC 105.2) has similar limited exemptions for certain small accessory structures, fences ≤7 ft high (plus all chain-link fences), and antennae/towers ≤25 ft high.§ 22-135
Structural triggers
Any structural alteration, addition, or work affecting load-bearing elements generally requires a permit under the adopted IRC (see R105 and amendments).
Use tax (construction materials use tax)
Prior to permit issuance, a deposit is required based on 3.75% (three and three-fourths percent) applied to 50% of the total estimated cost of the building/construction/reconstruction/alteration/expansion/modification/improvement (or 100% of the total estimated cost of construction materials/
Code reference
This is per Aurora City Code § 130-61.§ 130-61.
Code reference
All information is based on the Aurora Municipal Code (Chapter 22) and official city resources.

Codes are amended regularly — verify current requirements with City of Aurora — Building Division (Permit Center).

Zoning & Dimensional Standards

Setback & dimensional standards in Aurora

Zone-district dimensional standards for Aurora, quoted verbatim from the Aurora Unified Development Ordinance. Knowing your lot's district — and its setbacks, height, and coverage limits — is where every feasibility conversation starts.

I-1setback & dimensional standards
StandardRequirement
Rear Setback (min)5 ft.

Aurora Unified Development Ordinance I-1 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

I-2setback & dimensional standards
StandardRequirement
Rear Setback (min)5 ft.

Aurora Unified Development Ordinance I-2 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-1setback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)6,000 sf. [1]
Lot Frontage, Single-Family Detached (min)Subarea A: 50 ft. Subarea B: 60 ft.
Front Setback (min)25 ft. [4]
Side Interior Setback (min)5 ft. [6]
Side Setback Abutting Local Street (min)12.5 ft.
Rear Setback (min)20 ft.
Building Height (max)38 ft.

Aurora Unified Development Ordinance R-1 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-2setback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)6,000 sf. [1]
Lot Frontage, Single-Family Detached (min)Subarea A: 50 ft. Subarea B: 60 ft.
Front Setback (min)20 ft. [4]
Side Interior Setback (min)5 ft.[6]
Side Setback Abutting Local Street (min)10 ft.
Rear Setback (min)15 ft.
Building Height (max)38 ft.

Aurora Unified Development Ordinance R-2 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-3setback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)5,000 sf.
Lot Frontage, Single-Family Detached (min)50 ft.
Front Setback (min)15 ft.
Side Interior Setback (min)5 ft.
Side Setback Abutting Local Street (min)10 ft.
Rear Setback (min)10 ft.
Building Height (max)45 ft.[7]

Aurora Unified Development Ordinance R-3 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-4setback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)5,000 sf.
Lot Frontage, Single-Family Detached (min)50 ft.
Front Setback (min)12 ft.
Side Interior Setback (min)5 ft.
Side Setback Abutting Local Street (min)7.5 ft.
Rear Setback (min)10 ft.
Building Height (max)65 ft.[8]

Aurora Unified Development Ordinance R-4 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-MHsetback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)[2]
Front Setback (min)15 ft.
Side Interior Setback (min)5 ft.
Side Setback Abutting Local Street (min)15 ft.
Rear Setback (min)8 ft.
Building Height (max)20 ft.[9]

Aurora Unified Development Ordinance R-MH setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-Rsetback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)43,560 sf.
Lot Frontage, Single-Family Detached (min)120 ft.
Front Setback (min)30 ft.
Side Interior Setback (min)10 ft.
Side Setback Abutting Local Street (min)25 ft.
Rear Setback (min)25 ft.
Building Height (max)38 ft.

Aurora Unified Development Ordinance R-R setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

Verify current requirements with the jurisdiction — informational reference only. Standards vary by overlay, lot, and use; we confirm the exact rules for your property during feasibility.

overview

overview

This trade is Power-over-Ethernet IP video, not analog 24 V CCTV and not a burglar-alarm monitoring contract. Scope includes indoor and outdoor IP cameras, PoE switches or midspans (IEEE 802.3af, 802.3at, or 802.3bt), Category 6 or 6A runs, network video recorders or server-side storage, mounts, and viewing software. Camera types include dome, bullet, turret, multi-sensor, and specialty views where specified.

permits

permits

City and County of Denver Community Planning and Development issues electrical permits when new circuits, racks, or line-voltage equipment are added for PoE switches and recorders. CPD commercial plan-review guidance requires electrical review for new circuits above stated thresholds, including 10 or more new 20 A single-pole circuits, circuits above 20 A, three-phase, or voltages other than 120 V or 277 V. Some minor electrical work can use a CPD quick permit. DORA licenses electrical contractors. Cities and counties license general contractors. Colorado has no statewide general contractor license.

code

code

Denver Business Licensing requires a burglar-alarm company license for anyone who sells, installs, leases, maintains, repairs, replaces, or monitors burglar-alarm systems. Occupants need an alarm permit for a monitored burglar alarm. Camera-only IP video is a different path. Confirm with Business Licensing if the project includes alarm devices or monitoring. Landmark Preservation reviews exterior housings, conduit, and penetrations on designated structures and in historic districts.

methods

methods

Size PoE switch wattage and port count to the camera list before ordering hardware. Use Category 6 or 6A, weather-rated housings, drip loops, and listed firestop at rated walls. Put the switch and recorder on a UPS. Keep camera VLANs off guest Wi-Fi. Do not share raceways with line-voltage unless the method is listed for that use. Cost is project-specific.

FAQ

Common questions

Who handles the electrical permits and licensing?

A municipally licensed Denver general contractor coordinates licensed specialty trades. CPD issues electrical permits for new circuits serving PoE switches and recorders. DORA licenses electrical contractors. Colorado has no statewide general contractor license.

Do PoE cameras need a Denver burglar-alarm company license?

Denver requires a burglar-alarm company license for selling, installing, or monitoring burglar-alarm systems. Camera-only IP video is a different path. Confirm with Denver Business Licensing if the scope includes alarm devices or monitoring.

When is an electrical permit required?

New circuits, racks, or line-voltage equipment for PoE switches and NVRs typically need a CPD electrical permit. Confirm with CPD. Some minor electrical work can use a quick permit.

When does Landmark apply?

Exterior camera housings, conduit, and penetrations on a designated structure or in a historic district may need Landmark Preservation review in addition to electrical permits.

Service Area

Serving Aurora and Arapahoe/Adams County

We serve Aurora, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Aurora project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

TRUSTED TO BUILD FOR

  • Punch Bowl SocialFirst four locations
  • Spectrum RetirementSenior living communities
  • Denver HighlandsFirst modular custom home

Free Estimate

Get a free security camera systems — PoE estimate in Aurora

Tell us about your Aurora project — we respond fast, and estimates are always free.

Name, phone, and email required.