autotelic.build(720) 287-7958

DESIGN · BUILD · AUTOMATE

CASTLE ROCK SERVICES

Lighting Control in Castle Rock

Licensed lighting control services for Castle Rock and Douglas County. Set the scene with one touch.

What Castle Rock requires

Code reference: Exempt work follows the Town’s adopted amendments to the 2024 International Residential Code (IRC) and International Building Code (IBC), per Ordinance No. 2026-017 (effective around June 30, 2026). Ord. No. 2026-017

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Lighting Control

Set the scene with one touch

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Lighting Control Services in Castle Rock, Colorado

Autotelic provides professional lighting control services throughout Castle Rock and the surrounding Douglas County area. Lutron, Crestron, and Ketra lighting control systems with keypads, dimmers, scene programming, and daylight harvesting. Whether you're in Castle Rock (Douglas County seat) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.

Permit Thresholds

Castle Rock permit thresholds

Code reference
Exempt work follows the Town’s adopted amendments to the 2024 International Residential Code (IRC) and International Building Code (IBC), per Ordinance No. 2026-017 (effective around June 30, 2026).Ord. No. 2026-017
Code reference
One-story detached accessory non-habitable structures (tool sheds, playhouses, etc.) ≤ 120 sq ft, ≥ 10 ft from the nearest occupiable structure.
Code reference
Fences ≤ 6 ft high (swimming pool barriers of any height are *not* exempt).
Code reference
Shingle repair or replacement not exceeding one square (100 sq ft) of covering per building.
Code reference
The adopted codes (2024 IRC/IBC and related) govern when alterations trigger permitting.
Code reference
See Title 15 of the Castle Rock Municipal Code (and amendments in Ordinance 2026-017) for the full adopted code language on work exempt from permit (primarily amending IRC R105.2 and equivalent IBC sections).Ord. 2026-017
Building use tax
5.2% applied to 50% of the project’s valuation (materials estimated at half the valuation).
Code reference
This comprises the Town’s 4.2% use tax rate + Douglas County’s 1% use tax rate.
Ord. No. 2026-017Source: crgov.com

Codes are amended regularly — verify current requirements with **The Town of Castle Rock Building Division (part of Development Services) issues residential building permits within the town limits.

text

What this covers

Keypads, dimmers, and a controller for scenes across rooms. Typical: 0-10V, phase-dim, or a lighting-control network on the LAN.

text

Technical scope

Keypads, dimmers, and a controller for scenes across rooms. Typical: 0-10V, phase-dim, or a lighting-control network on the LAN. Fixture supply can be owner or contractor; load types must match the dimming method.

text

How the work is coordinated

Fixture supply can be owner or contractor; load types must match the dimming method. Denver-metro work is permitted locally. Colorado has no statewide general-contractor license. Cities and counties license general contractors. DORA licenses electrical and plumbing (and similar regulated trades), not general contractors. Autotelic is a municipally licensed Denver general contractor that coordinates licensed specialty trades. Denver building permits run through Community Planning and Development (CPD). Costs are project-specific; no dollar figures.

FAQ

Common questions

Who handles the lighting control permits and licensing?

A municipally licensed Denver general contractor coordinates licensed specialty trades. Colorado has no statewide general-contractor license; cities and counties license general contractors. DORA licenses electrical and plumbing, not general contractors.

What is typically in scope for lighting control in Denver?

Keypads, dimmers, and a controller for scenes across rooms.

When do you need drawings or a permit?

Anything that changes structure, occupancy, or regulated electrical or plumbing usually needs a local permit. Denver building permits are reviewed by Community Planning and Development. Confirm the exact trigger with CPD for the address.

Service Area

Serving Castle Rock and Douglas County

We serve Castle Rock, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Castle Rock project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

TRUSTED TO BUILD FOR

  • Punch Bowl SocialFirst four locations
  • Spectrum RetirementSenior living communities
  • Denver HighlandsFirst modular custom home

Free Estimate

Get a free lighting control estimate in Castle Rock

Tell us about your Castle Rock project — we respond fast, and estimates are always free.

Name, phone, and email required.

Verifying you're human…