autotelic.build(720) 287-7958

DESIGN · BUILD · AUTOMATE

ERIE SERVICES

Custom Modular Home in Erie

Licensed custom modular home services for Erie and Boulder/Weld County. Factory precision. Custom design. On-site assembly..

  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Custom Modular Home

Factory precision. Custom design. On-site assembly.

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Custom Modular Home Services in Erie, Colorado

Autotelic provides professional custom modular home services throughout Erie and the surrounding Boulder/Weld County area. Licensed modular home installation across the Denver metro — factory-precision construction with on-site assembly, Tesla Solar Roof, and smart home automation. Whether you're in Erie (fast-growing between Denver and Boulder) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.

Permit Thresholds

Erie permit thresholds

Code reference
The Town of Erie has adopted the 2021 International Residential Code (IRC).
Code reference
Roofing (more than 1 square aggregate)
Code reference
Retaining walls over 4 feet from the bottom of the trench to the top of the wall
Code reference
Detached accessory structures 200 sq. ft. or less (not including patio covers, and provided there is no electrical and/or plumbing work)
Code reference
Minor fence repair (3 sections or less)
Code reference
Minor roof repairs (1 square or less)
Code reference
Decks, platforms, walks, and driveways not more than 30 inches above grade and not over any basement or story below
Code reference
Examples of square foot construction costs for valuation (as of January 1, 2026):

Codes are amended regularly — verify current requirements with **Town of Erie Building Division (Town of Erie, Colorado).

Energy Code

Erie energy code quick facts

Code reference
The Town of Erie, Colorado, has adopted the 2024 International Energy Conservation Code (IECC) with local amendments, effective April 24, 2026.
Code reference
This adoption was approved by the Erie Town Council via Ordinance No. 12-2026.Ordinance No. 12-2026
Code reference
Erie is located in Climate Zone 5B.
Code reference
While Erie has adopted the 2024 IECC with local amendments, the specific details of these amendments relevant to prescriptive requirements for remodels and additions were not detailed in the publicly available information.
Code reference
Therefore, the following prescriptive requirements are based on the base 2024 IECC for Climate Zone 5B, which Erie adopted, and are subject to any specific local modifications enacted through Ordinance No. 12-2026.Ordinance No. 12-2026
Wall Insulation (Residential)
The building thermal envelope for walls shall meet requirements specified in Table R402.1.2.
Code reference
A common prescriptive option for framed walls in Climate Zone 5B is R-20 continuous insulation, or R-13 cavity insulation plus R-5 continuous insulation (denoted as "13&5").
Code reference
The 2024 IECC also offers additional flexibility for wall insulation in Climate Zones 4 and 5 if additional credits are achieved.

Codes are amended regularly — verify current requirements with **Town of Erie Building Division (Town of Erie, Colorado).

text

What this covers

Factory-built modules set on a Denver-area foundation with site-built connections. Transport, crane, and weather window are part of the plan; finish and utility tie-in happen on site.

text

How the work is coordinated

Permits cover both the factory package and the site work through the local building department. Denver-metro work is permitted locally. Colorado has no statewide general-contractor license. Cities and counties license general contractors. DORA licenses electrical and plumbing (and similar regulated trades), not general contractors. Autotelic is a municipally licensed Denver general contractor that coordinates licensed specialty trades. Denver building permits run through Community Planning and Development (CPD). Costs are project-specific; no dollar figures.

FAQ

Common questions

Who handles the custom modular home permits and licensing?

A municipally licensed Denver general contractor coordinates licensed specialty trades. Colorado has no statewide general-contractor license; cities and counties license general contractors. DORA licenses electrical and plumbing, not general contractors.

What is typically in scope for custom modular home in Denver?

Factory-built modules set on a Denver-area foundation with site-built connections.

When do you need drawings or a permit?

Anything that changes structure, occupancy, or regulated electrical or plumbing usually needs a local permit. Denver building permits are reviewed by Community Planning and Development. Confirm the exact trigger with CPD for the address.

Service Area

Serving Erie and Boulder/Weld County

We serve Erie, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Erie project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

TRUSTED TO BUILD FOR

  • Punch Bowl SocialFirst four locations
  • Spectrum RetirementSenior living communities
  • Denver HighlandsFirst modular custom home

Let's design your perfect Custom Modular Home together

Get a personalized estimate in about 2 minutes — no pressure, no obligation.

Licensed & Insured ContractorVeteran-Owned

How This Works (2 minutes)

  1. 1Tell us about your project (30 seconds)
  2. 2Answer a few quick questions for an accurate estimate (60 seconds)
  3. 3Get your personalized estimate instantly (30 seconds)

No pressure. No obligation. No spam calls. If we're not the right fit, we'll tell you — and even recommend someone who is.