autotelic.build

DESIGN · BUILD · AUTOMATE

CHERRY HILLS VILLAGE SERVICES

Concrete Foundations in Cherry Hills Village

Licensed concrete foundations services for Cherry Hills Village and Arapahoe County. Every great build starts below grade.

  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Concrete Foundations

Every great build starts below grade

Local Service

Concrete Foundations Services in Cherry Hills Village, Colorado

Autotelic provides professional concrete foundations services throughout Cherry Hills Village and the surrounding Arapahoe County area. Foundation construction across the Denver metro — footings, stem walls, slabs, and pier systems with rebar, waterproofing, and structural engineering coordination. Whether you're in Cherry Hills Village (affluent south Denver) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.

Permit Thresholds

Cherry Hills Village permit thresholds

Code reference
The Village adopted the 2024 International Codes (I-Codes) at the beginning of 2026, including the 2024 International Residential Code (IRC), and adheres to Chapter 18 of the Cherry Hills Village Municipal Code for building regulations.
Code reference
If an addition is more than 50% of the existing square footage, or if the aggregate floor area is demolished or reconstructed by more than 50%, or increased by 50% or more, the project is considered "redevelopment" and may have additional submittal and drainage requirements per Chapter 9 of the zoni
Code reference
Any electrical work on 400 amps (320 continuous) or greater requires a separate plan review.
Impervious Surface
If more than 2,500 square feet of impervious surface is added cumulatively (e.g., house addition, driveway, patio), a Phase III Drainage Plan is required.
Code Reference
Cherry Hills Village Municipal Code, Chapter 18, and the adopted 2024 International Residential Code.
Code reference
### Exempt Work (Cherry Hills Village Municipal Code Section 105.2, referencing adopted I-Codes)Section 105.2
Code reference
One-story detached, prefabricated storage sheds that do not exceed 120 square feet.
Code Reference
Cherry Hills Village Municipal Code, Section 105.2, referencing adopted I-Codes.Section 105.2

Codes are amended regularly — verify current requirements with **The City of Cherry Hills Village (specifically its Building Division under Community Development) issues residential building permits.

Energy Code

Cherry Hills Village energy code quick facts

Code reference
Cherry Hills Village, Colorado, has adopted the 2024 International Energy Conservation Code (IECC).
Code reference
However, state law requires local jurisdictions to adopt and enforce the 2021 International Energy Conservation Code (IECC) and the Colorado Model Electric Ready and Solar Ready Code when updating any other building code, with amendments not permitted to decrease effectiveness or energy efficiency.
Code reference
An ordinance (Ordinance No. 2023, Series 1) also indicates the adoption of the 2021 International Energy Conservation Code.Ordinance No. 2023
Code reference
Cherry Hills Village is located in IECC Climate Zone 5B.
Code reference
The following are key prescriptive requirements for residential remodels and additions, based on the 2021 IECC for Climate Zone 5B, which serve as minimum standards under the adopted energy code:
Code reference
### Key Prescriptive Requirements for Remodels/Additions (2021 IECC, Climate Zone 5B)
Requirement
R-49 minimum, with an R-60 retrofit recommended.
Code reference
The 2021 IECC raised the prescriptive ceiling to R-60, with R-49 acceptable only with a raised-heel truss (per IECC R402.2.1).

Codes are amended regularly — verify current requirements with **The City of Cherry Hills Village (specifically its Building Division under Community Development) issues residential building permits.

text

What foundation work covers

Foundation work in the Denver metro includes footings, stem walls, basement walls, and slabs-on-grade, plus the excavation that makes room for them. Soils and frost depth set the section. A municipally licensed Denver general contractor coordinates the project, design professionals, and licensed specialty trades. Cost is project-specific and depends on soils, depth, and whether the work is new or a repair.

text

Inspections and when drawings are sealed

City and County of Denver Community Planning and Development inspects footing depth and width and watches for setback encroachment at the footing or slab. Work cannot start until permits are issued. If the design exceeds IRC prescriptive limits (underpinning, sister curb, bench footing, basement dig-outs, helical or push piles), CPD asks for sealed drawings and calculations (DBCA 133.2). Phased permits can split foundation from superstructure.

text

Permits and who coordinates the work

Building permits come through CPD e-permits. Denver DOTI reviews Sewer Use and Drainage for excavations, grading, floodplain, and groundwater. Check floodplain at denvergov.org/flood. Cities and counties license general contractors. Colorado has no statewide general contractor license. Autotelic acts as a municipally licensed Denver general contractor and coordinates licensed specialty trades plus the design professionals required for the project.

text

What buyers should prepare

New house versus repair, basement versus crawl, any soils report, and distance to lot lines.

FAQ

Common questions

Do foundations need a Denver permit?

Yes. Work cannot start until CPD issues the permit. Footing inspections check depth, width, and setbacks.

Who handles foundation permits and licensing?

A municipally licensed Denver general contractor coordinates the project, design professionals, and specialty trades. Colorado has no statewide general contractor license.

Can I pull a foundation permit before the house drawings?

CPD allows phased building permits such as foundation then superstructure. Confirm the path on the log before excavating.

When is an engineer package required?

When the work goes beyond IRC prescriptive limits, including underpinning, basement dig-outs, and proprietary deep-foundation repairs. CPD wants sealed calculations.

What information helps define scope?

New vs repair, soils report if any, lot-line clearance, floodplain, and city or county.

Service Area

Serving Cherry Hills Village and Arapahoe County

We serve Cherry Hills Village, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Cherry Hills Village project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

TRUSTED TO BUILD FOR

  • Punch Bowl SocialFirst four locations
  • Spectrum RetirementSenior living communities
  • Denver HighlandsFirst modular custom home

Free Estimate

Get a free concrete foundations estimate in Cherry Hills Village

Tell us about your Cherry Hills Village project — we respond fast, and estimates are always free.

Name, phone, and email required.