autotelic.build

DESIGN · BUILD · AUTOMATE

LAKEWOOD SERVICES

Concrete Foundations in Lakewood

Licensed concrete foundations services for Lakewood and Jefferson County. Every great build starts below grade.

  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Concrete Foundations

Every great build starts below grade

Local Service

Concrete Foundations Services in Lakewood, Colorado

Autotelic provides professional concrete foundations services throughout Lakewood and the surrounding Jefferson County area. Foundation construction across the Denver metro — footings, stem walls, slabs, and pier systems with rebar, waterproofing, and structural engineering coordination. Whether you're in Lakewood (Jefferson County's largest city) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.

Permits & Licensing

Permits in Lakewood

Lakewood building and construction permits are issued through the Public Works Department, and contractors must be registered with the city and hold a Lakewood contractor account before pulling permits. Permitting and inspections run through the city's eTRAKiT online system. Authority: City of Lakewood — Public Works Department (Building and Construction Permits).

Zoning & Dimensional Standards

Setback & dimensional standards in Lakewood

Zone-district dimensional standards for Lakewood, quoted verbatim from the Lakewood Zoning Code (2025). Knowing your lot's district — and its setbacks, height, and coverage limits — is where every feasibility conversation starts.

C-Lsetback & dimensional standards
StandardRequirement
Front Setback (min)15 ft.
Side Setback (min)5 ft.
Rear Setback (min)5 ft.
Building Height (max)45 ft.
Open Space (min %)25%

Lakewood Zoning Code (2025) C-L setback standards (Article 5 Tables 4 & 8 Dimensional Standards (§17.5)) — effective 2025-03-24 · View the code

C-Rsetback & dimensional standards
StandardRequirement
Front Setback (min)15 ft.
Side Setback (min)5 ft.
Rear Setback (min)5 ft.
Building Height (max)90 ft.
Open Space (min %)25%

Lakewood Zoning Code (2025) C-R setback standards (Article 5 Tables 4 & 8 Dimensional Standards (§17.5)) — effective 2025-03-24 · View the code

LIsetback & dimensional standards
StandardRequirement
Front Setback (min)15 ft.
Side Setback (min)5 ft.
Rear Setback (min)5 ft.
Building Height (max)60 ft.
Open Space (min %)25%

Lakewood Zoning Code (2025) LI setback standards (Article 5 Tables 4 & 8 Dimensional Standards (§17.5)) — effective 2025-03-24 · View the code

R-L-Asetback & dimensional standards
StandardRequirement
Front Setback (min)25 ft.
Side Setback (min)10 ft.
Non-Primary Frontage Front Setback (min)20 ft.
Rear Setback (min)15 ft.
Building Height (max)35 ft.
Minimum Lot Size7,000 sq. ft.
Minimum Lot Width75 ft.
Open Space (min %)50%

Lakewood Zoning Code (2025) R-L-A setback standards (Article 5 Tables 4 & 8 Dimensional Standards (§17.5)) — effective 2025-03-24 · View the code

R-L-Bsetback & dimensional standards
StandardRequirement
Front Setback (min)25 ft.
Side Setback (min)5 ft.
Non-Primary Frontage Front Setback (min)20 ft.
Rear Setback (min)15 ft.
Building Height (max)35 ft.
Minimum Lot Size5,000 sq. ft.
Minimum Lot Width60 ft.
Open Space (min %)50%

Lakewood Zoning Code (2025) R-L-B setback standards (Article 5 Tables 4 & 8 Dimensional Standards (§17.5)) — effective 2025-03-24 · View the code

R-L-Csetback & dimensional standards
StandardRequirement
Front Setback (min)25 ft.
Side Setback (min)5 ft.
Non-Primary Frontage Front Setback (min)20 ft.
Rear Setback (min)15 ft.
Building Height (max)35 ft.
Minimum Lot Size1,500 sq. ft.
Minimum Lot Width25 ft.
Open Space (min %)50%

Lakewood Zoning Code (2025) R-L-C setback standards (Article 5 Tables 4 & 8 Dimensional Standards (§17.5)) — effective 2025-03-24 · View the code

R-L-MHsetback & dimensional standards
StandardRequirement
Front Setback (min)25 ft.
Side Setback (min)5 ft.
Non-Primary Frontage Front Setback (min)20 ft.
Rear Setback (min)15 ft.
Building Height (max)25 ft.
Minimum Lot Width35 (SW) 40 (DW)
Open Space (min %)25%

Lakewood Zoning Code (2025) R-L-MH setback standards (Article 5 Tables 4 & 8 Dimensional Standards (§17.5)) — effective 2025-03-24 · View the code

R-Msetback & dimensional standards
StandardRequirement
Front Setback (min)10 ft.
Side Setback (min)5 ft.
Non-Primary Frontage Front Setback (min)10 ft.
Rear Setback (min)15 ft.
Building Height (max)45 ft.
Minimum Lot Width18 ft.
Open Space (min %)30%

Lakewood Zoning Code (2025) R-M setback standards (Article 5 Tables 4 & 8 Dimensional Standards (§17.5)) — effective 2025-03-24 · View the code

Verify current requirements with the jurisdiction — informational reference only. Standards vary by overlay, lot, and use; we confirm the exact rules for your property during feasibility.

text

What foundation work covers

Foundation work in the Denver metro includes footings, stem walls, basement walls, and slabs-on-grade, plus the excavation that makes room for them. Soils and frost depth set the section. A municipally licensed Denver general contractor coordinates the project, design professionals, and licensed specialty trades. Cost is project-specific and depends on soils, depth, and whether the work is new or a repair.

text

Inspections and when drawings are sealed

City and County of Denver Community Planning and Development inspects footing depth and width and watches for setback encroachment at the footing or slab. Work cannot start until permits are issued. If the design exceeds IRC prescriptive limits (underpinning, sister curb, bench footing, basement dig-outs, helical or push piles), CPD asks for sealed drawings and calculations (DBCA 133.2). Phased permits can split foundation from superstructure.

text

Permits and who coordinates the work

Building permits come through CPD e-permits. Denver DOTI reviews Sewer Use and Drainage for excavations, grading, floodplain, and groundwater. Check floodplain at denvergov.org/flood. Cities and counties license general contractors. Colorado has no statewide general contractor license. Autotelic acts as a municipally licensed Denver general contractor and coordinates licensed specialty trades plus the design professionals required for the project.

text

What buyers should prepare

New house versus repair, basement versus crawl, any soils report, and distance to lot lines.

FAQ

Common questions

Do foundations need a Denver permit?

Yes. Work cannot start until CPD issues the permit. Footing inspections check depth, width, and setbacks.

Who handles foundation permits and licensing?

A municipally licensed Denver general contractor coordinates the project, design professionals, and specialty trades. Colorado has no statewide general contractor license.

Can I pull a foundation permit before the house drawings?

CPD allows phased building permits such as foundation then superstructure. Confirm the path on the log before excavating.

When is an engineer package required?

When the work goes beyond IRC prescriptive limits, including underpinning, basement dig-outs, and proprietary deep-foundation repairs. CPD wants sealed calculations.

What information helps define scope?

New vs repair, soils report if any, lot-line clearance, floodplain, and city or county.

Service Area

Serving Lakewood and Jefferson County

We serve Lakewood, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Lakewood project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

TRUSTED TO BUILD FOR

  • Punch Bowl SocialFirst four locations
  • Spectrum RetirementSenior living communities
  • Denver HighlandsFirst modular custom home

Free Estimate

Get a free concrete foundations estimate in Lakewood

Tell us about your Lakewood project — we respond fast, and estimates are always free.

Name, phone, and email required.