autotelic.build

DESIGN · BUILD · AUTOMATE

AURORA SERVICES

Concrete Foundations in Aurora

Licensed concrete foundations services for Aurora and Arapahoe/Adams County. Every great build starts below grade.

  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Concrete Foundations

Every great build starts below grade

Local Service

Concrete Foundations Services in Aurora, Colorado

Autotelic provides professional concrete foundations services throughout Aurora and the surrounding Arapahoe/Adams County area. Foundation construction across the Denver metro — footings, stem walls, slabs, and pier systems with rebar, waterproofing, and structural engineering coordination. Whether you're in Aurora (Colorado's third-largest city) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.

Permits & Licensing

Permits in Aurora

Aurora building permits are issued by the Building Division's Permit Center, which also handles public improvement, sign, and lawn and irrigation permits. Contractor licensing is a City of Aurora requirement, and applications go through the Aurora4Biz.org online portal. Authority: City of Aurora — Building Division (Permit Center).

Zoning & Dimensional Standards

Setback & dimensional standards in Aurora

Zone-district dimensional standards for Aurora, quoted verbatim from the Aurora Unified Development Ordinance. Knowing your lot's district — and its setbacks, height, and coverage limits — is where every feasibility conversation starts.

I-1setback & dimensional standards
StandardRequirement
Rear Setback (min)5 ft.

Aurora Unified Development Ordinance I-1 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

I-2setback & dimensional standards
StandardRequirement
Rear Setback (min)5 ft.

Aurora Unified Development Ordinance I-2 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-1setback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)6,000 sf. [1]
Lot Frontage, Single-Family Detached (min)Subarea A: 50 ft. Subarea B: 60 ft.
Front Setback (min)25 ft. [4]
Side Interior Setback (min)5 ft. [6]
Side Setback Abutting Local Street (min)12.5 ft.
Rear Setback (min)20 ft.
Building Height (max)38 ft.

Aurora Unified Development Ordinance R-1 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-2setback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)6,000 sf. [1]
Lot Frontage, Single-Family Detached (min)Subarea A: 50 ft. Subarea B: 60 ft.
Front Setback (min)20 ft. [4]
Side Interior Setback (min)5 ft.[6]
Side Setback Abutting Local Street (min)10 ft.
Rear Setback (min)15 ft.
Building Height (max)38 ft.

Aurora Unified Development Ordinance R-2 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-3setback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)5,000 sf.
Lot Frontage, Single-Family Detached (min)50 ft.
Front Setback (min)15 ft.
Side Interior Setback (min)5 ft.
Side Setback Abutting Local Street (min)10 ft.
Rear Setback (min)10 ft.
Building Height (max)45 ft.[7]

Aurora Unified Development Ordinance R-3 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-4setback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)5,000 sf.
Lot Frontage, Single-Family Detached (min)50 ft.
Front Setback (min)12 ft.
Side Interior Setback (min)5 ft.
Side Setback Abutting Local Street (min)7.5 ft.
Rear Setback (min)10 ft.
Building Height (max)65 ft.[8]

Aurora Unified Development Ordinance R-4 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-MHsetback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)[2]
Front Setback (min)15 ft.
Side Interior Setback (min)5 ft.
Side Setback Abutting Local Street (min)15 ft.
Rear Setback (min)8 ft.
Building Height (max)20 ft.[9]

Aurora Unified Development Ordinance R-MH setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-Rsetback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)43,560 sf.
Lot Frontage, Single-Family Detached (min)120 ft.
Front Setback (min)30 ft.
Side Interior Setback (min)10 ft.
Side Setback Abutting Local Street (min)25 ft.
Rear Setback (min)25 ft.
Building Height (max)38 ft.

Aurora Unified Development Ordinance R-R setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

Verify current requirements with the jurisdiction — informational reference only. Standards vary by overlay, lot, and use; we confirm the exact rules for your property during feasibility.

text

What foundation work covers

Foundation work in the Denver metro includes footings, stem walls, basement walls, and slabs-on-grade, plus the excavation that makes room for them. Soils and frost depth set the section. A municipally licensed Denver general contractor coordinates the project, design professionals, and licensed specialty trades. Cost is project-specific and depends on soils, depth, and whether the work is new or a repair.

text

Inspections and when drawings are sealed

City and County of Denver Community Planning and Development inspects footing depth and width and watches for setback encroachment at the footing or slab. Work cannot start until permits are issued. If the design exceeds IRC prescriptive limits (underpinning, sister curb, bench footing, basement dig-outs, helical or push piles), CPD asks for sealed drawings and calculations (DBCA 133.2). Phased permits can split foundation from superstructure.

text

Permits and who coordinates the work

Building permits come through CPD e-permits. Denver DOTI reviews Sewer Use and Drainage for excavations, grading, floodplain, and groundwater. Check floodplain at denvergov.org/flood. Cities and counties license general contractors. Colorado has no statewide general contractor license. Autotelic acts as a municipally licensed Denver general contractor and coordinates licensed specialty trades plus the design professionals required for the project.

text

What buyers should prepare

New house versus repair, basement versus crawl, any soils report, and distance to lot lines.

FAQ

Common questions

Do foundations need a Denver permit?

Yes. Work cannot start until CPD issues the permit. Footing inspections check depth, width, and setbacks.

Who handles foundation permits and licensing?

A municipally licensed Denver general contractor coordinates the project, design professionals, and specialty trades. Colorado has no statewide general contractor license.

Can I pull a foundation permit before the house drawings?

CPD allows phased building permits such as foundation then superstructure. Confirm the path on the log before excavating.

When is an engineer package required?

When the work goes beyond IRC prescriptive limits, including underpinning, basement dig-outs, and proprietary deep-foundation repairs. CPD wants sealed calculations.

What information helps define scope?

New vs repair, soils report if any, lot-line clearance, floodplain, and city or county.

Service Area

Serving Aurora and Arapahoe/Adams County

We serve Aurora, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Aurora project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

TRUSTED TO BUILD FOR

  • Punch Bowl SocialFirst four locations
  • Spectrum RetirementSenior living communities
  • Denver HighlandsFirst modular custom home

Free Estimate

Get a free concrete foundations estimate in Aurora

Tell us about your Aurora project — we respond fast, and estimates are always free.

Name, phone, and email required.