DESIGN · BUILD · AUTOMATE
BOULDER SERVICES
Ubiquiti Enterprise Networking in Boulder
WiFi & Network Assessment (Written Report), $189
Licensed ubiquiti enterprise networking services for Boulder and Boulder County. Enterprise-grade networking. Ubiquiti powered..
What Boulder requires
Exempt work (no permit required, though work must still comply with all applicab: The complete list is referenced in Boulder Revised Code (B.R.C.) 1981, Title 10, Chapter 5, Section 10-5-2 (Adoption of International Building Code with Modifications, including exemptions in section J). §10-5-2
See full local requirements ↓- Full Design Lifecycle
- Construction & Tenant Finish
- Smart Home · A/V · Edge Compute

Enterprise-grade networking. Ubiquiti powered.
Book online
Pick your job and choose a time.
Pay when you book. We confirm within 24 hours or refund you in full.
WiFi & Network Assessment (Written Report)
On-site signal survey, speed and interference testing, and equipment review, delivered as a written findings report with a prioritized fix plan and firm pricing.
Pay when you book · morning (8–12) or afternoon (12–4)
What's included
On-site signal survey, speed and interference testing, and equipment review, delivered as a written findings report with a prioritized fix plan and firm pricing. Hardware and remediation labor are not included.
FREE PLANNING TOOLS
Both tools are free and take a couple of minutes — start in either one.
EVERY PROJECT STARTS WITH DESIGN
Local Service
Ubiquiti Enterprise Networking Services in Boulder, Colorado
Autotelic provides professional ubiquiti enterprise networking services throughout Boulder and the surrounding Boulder County area. Ubiquiti UniFi enterprise networking across the Denver metro — Dream Machine Pro, managed switches, Wi-Fi 6/6E access points, VLANs, and network monitoring. Whether you're in Boulder (home to CU Boulder) or nearby communities, our team delivers quality workmanship, licensed and insured.
The build sequence for a Ubiquiti Enterprise Networking project
This service is a component of How a Venue project works in Boulder.
- Ubiquiti Enterprise Networking feasibility in Boulder
- How a Ubiquiti Enterprise Networking project is estimated
- Booking a Ubiquiti Enterprise Networking service
- Managing a Ubiquiti Enterprise Networking job in the client portal
- On site: the crew app
- The technology layer for a Ubiquiti Enterprise Networking project
Permit Thresholds
Boulder permit thresholds
- Exempt work (no permit required, though work must still comply with all applicab
- The complete list is referenced in Boulder Revised Code (B.R.C.) 1981, Title 10, Chapter 5, Section 10-5-2 (Adoption of International Building Code with Modifications, including exemptions in section J).§10-5-2
- Code reference
- Minor drywall repairs (<1 sheet or 32 sq ft).
- Code reference
- One-story accessory sheds (≤120 sq ft, ≤10 ft high, no utilities/electrical/mechanical/plumbing).
- Code reference
- Fences ≤7 ft high.
- Code reference
- Flatwork (private sidewalks, patios, driveways) ≤30 inches above grade, not over a basement/story below, and not part of an accessible route.
- Code reference
- Playground equipment accessory to 1- or 2-family dwellings.
- Code reference
- Prefabricated above-ground swimming pools accessory to 1- or 2-family dwellings (<24 inches deep, ≤5,000 gallons).
- Code reference
- Retaining walls ≤3 ft high (measured from footing bottom to wall top), unless supporting a surcharge or impounding certain flammables.
Codes are amended regularly — verify current requirements with **City of Boulder Planning and Development Services (P&DS; specifically its Building Permits and Inspections section) issues residential building permits for properties within Boulder city limits.
Zoning & Dimensional Standards
Setback & dimensional standards in Boulder
Zone-district dimensional standards for Boulder, quoted verbatim from the Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026). Knowing your lot's district — and its setbacks, height, and coverage limits — is where every feasibility conversation starts.
Asetback & dimensional standards
| Standard | Requirement |
|---|---|
| Front Setback (min) | 25' (k) |
| Side Interior Setback (min) | 15' |
| Side Setback Abutting Street (min) | 25' |
| Rear Setback (min) | 25' |
| Building Height (max) | 35' |
Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) A setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code
BCsetback & dimensional standards
| Standard | Requirement |
|---|---|
| Front Setback (min) | 20' |
| Side Interior Setback (min) | 0' or 12' |
| Side Setback Abutting Street (min) | 15' |
| Rear Setback (min) | 20' |
| Building Height (max) | 35'; 40' (in I-zones) |
Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) BC setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code
BCSsetback & dimensional standards
| Standard | Requirement |
|---|---|
| Front Setback (min) | 10' |
| Side Interior Setback (min) | 0' or 12' |
| Side Setback Abutting Street (min) | 10' |
| Rear Setback (min) | 20' |
| Building Height (max) | 35' |
Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) BCS setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code
BMSsetback & dimensional standards
| Standard | Requirement |
|---|---|
| Front Setback (min) | 0' (k) |
| Side Interior Setback (min) | 0' or 5' |
| Side Setback Abutting Street (min) | 0' for first and second stories 12' for third story and above |
| Rear Setback (min) | 0' |
| Building Height (max) | 38' |
Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) BMS setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code
BRsetback & dimensional standards
| Standard | Requirement |
|---|---|
| Front Setback (min) | 20' |
| Side Interior Setback (min) | 0' or 12' |
| Side Setback Abutting Street (min) | 15' |
| Rear Setback (min) | 20' |
| Building Height (max) | 35'; 40' (in I-zones) |
Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) BR setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code
BT-1setback & dimensional standards
| Standard | Requirement |
|---|---|
| Front Setback (min) | 20' |
| Side Interior Setback (min) | 0' or 12' |
| Side Setback Abutting Street (min) | 15' |
| Rear Setback (min) | 20' |
| Building Height (max) | 35'; 40' (in I-zones) |
Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) BT-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code
BT-2setback & dimensional standards
| Standard | Requirement |
|---|---|
| Front Setback (min) | 20' |
| Side Interior Setback (min) | 10' |
| Side Setback Abutting Street (min) | 15' |
| Rear Setback (min) | 25' |
| Building Height (max) | 35'; 40' (in I-zones) |
Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) BT-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code
DT-1setback & dimensional standards
| Standard | Requirement |
|---|---|
| Front Setback (min) | 0' (k) |
| Side Interior Setback (min) | 0' or 12' |
| Side Setback Abutting Street (min) | 0' (k) |
| Rear Setback (min) | 15' |
| Building Height (max) | 38' |
Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) DT-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code
DT-2setback & dimensional standards
| Standard | Requirement |
|---|---|
| Front Setback (min) | 0' (k) |
| Side Interior Setback (min) | 0' or 12' |
| Side Setback Abutting Street (min) | 0' (k) |
| Rear Setback (min) | 15' |
| Building Height (max) | 38' |
Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) DT-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code
DT-3setback & dimensional standards
| Standard | Requirement |
|---|---|
| Front Setback (min) | 0' (k) |
| Side Interior Setback (min) | 0' or 12' |
| Side Setback Abutting Street (min) | 0' (k) |
| Rear Setback (min) | 15' |
| Building Height (max) | 38' |
Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) DT-3 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code
DT-4setback & dimensional standards
| Standard | Requirement |
|---|---|
| Front Setback (min) | 0' (k) |
| Side Interior Setback (min) | 0' or 12' |
| Side Setback Abutting Street (min) | 0' |
| Rear Setback (min) | 15' |
| Building Height (max) | 38' |
Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) DT-4 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code
DT-5setback & dimensional standards
| Standard | Requirement |
|---|---|
| Front Setback (min) | 0' (k) |
| Side Interior Setback (min) | 0' or 12' |
| Side Setback Abutting Street (min) | 0' (k) |
| Rear Setback (min) | 15' |
| Building Height (max) | 38' |
Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) DT-5 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code
IGsetback & dimensional standards
| Standard | Requirement |
|---|---|
| Front Setback (min) | 20' |
| Side Interior Setback (min) | 0' or 12' |
| Side Setback Abutting Street (min) | 15' |
| Rear Setback (min) | 20' |
| Building Height (max) | 35'; 40' (in I-zones) |
Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) IG setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code
IMsetback & dimensional standards
| Standard | Requirement |
|---|---|
| Front Setback (min) | 20' |
| Side Interior Setback (min) | 0' or 12' |
| Side Setback Abutting Street (min) | 15' |
| Rear Setback (min) | 20' |
| Building Height (max) | 35'; 40' (in I-zones) |
Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) IM setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code
IMSsetback & dimensional standards
| Standard | Requirement |
|---|---|
| Front Setback (min) | 0' (k) |
| Side Interior Setback (min) | 0' or 5' |
| Side Setback Abutting Street (min) | 0' |
| Rear Setback (min) | 10' |
| Building Height (max) | 35' |
Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) IMS setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code
IS-1setback & dimensional standards
| Standard | Requirement |
|---|---|
| Front Setback (min) | 20' |
| Side Interior Setback (min) | 0' or 12' |
| Side Setback Abutting Street (min) | 15' |
| Rear Setback (min) | 20' |
| Building Height (max) | 35'; 40' (in I-zones) |
Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) IS-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code
IS-2setback & dimensional standards
| Standard | Requirement |
|---|---|
| Front Setback (min) | 20' |
| Side Interior Setback (min) | 0' or 12' |
| Side Setback Abutting Street (min) | 15' |
| Rear Setback (min) | 20' |
| Building Height (max) | 35'; 40' (in I-zones) |
Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) IS-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code
MHsetback & dimensional standards
| Standard | Requirement |
|---|---|
| Front Setback (min) | See section 9-7-13 |
| Side Interior Setback (min) | See section 9-7-13 |
| Rear Setback (min) | See section 9-7-13 |
| Building Height (max) | 35' |
Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) MH setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code
MU-1setback & dimensional standards
| Standard | Requirement |
|---|---|
| Front Setback (min) | 15' |
| Side Interior Setback (min) | 0' or 5' |
| Side Setback Abutting Street (min) | 0' or 5' (b) |
| Rear Setback (min) | 10' |
| Building Height (max) | 35' |
Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) MU-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code
MU-2setback & dimensional standards
| Standard | Requirement |
|---|---|
| Front Setback (min) | 0' (k) |
| Side Interior Setback (min) | 0' or 5' |
| Side Setback Abutting Street (min) | 0' |
| Rear Setback (min) | 10' |
| Building Height (max) | 35' |
Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) MU-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code
MU-3setback & dimensional standards
| Standard | Requirement |
|---|---|
| Front Setback (min) | 0' (k) |
| Side Interior Setback (min) | 0' or 5' |
| Side Setback Abutting Street (min) | 0' for first and second stories 12' for third story and above |
| Rear Setback (min) | 15' |
| Building Height (max) | 38' |
Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) MU-3 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code
MU-4setback & dimensional standards
| Standard | Requirement |
|---|---|
| Front Setback (min) | 0' (k) |
| Side Interior Setback (min) | 0' or 5' |
| Side Setback Abutting Street (min) | 0' for first and second stories 12' for third story and above |
| Rear Setback (min) | 0' |
| Building Height (max) | 38' |
Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) MU-4 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code
Psetback & dimensional standards
| Standard | Requirement |
|---|---|
| Front Setback (min) | 25' (k) |
| Side Interior Setback (min) | 10' |
| Side Setback Abutting Street (min) | 12.5' (k) |
| Rear Setback (min) | 25' |
| Building Height (max) | 35' |
Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) P setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code
REsetback & dimensional standards
| Standard | Requirement |
|---|---|
| Front Setback (min) | 25' (k) |
| Side Interior Setback (min) | 10' |
| Side Setback Abutting Street (min) | 25' |
| Rear Setback (min) | 25' |
| Building Height (max) | 35' |
Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RE setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code
RH-1setback & dimensional standards
| Standard | Requirement |
|---|---|
| Front Setback (min) | 15' |
| Side Interior Setback (min) | 0' or 3' |
| Side Setback Abutting Street (min) | 1' per 2' of bldg. height, 10' min. (i) |
| Rear Setback (min) | 15' |
| Building Height (max) | 35' |
Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RH-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code
RH-2setback & dimensional standards
| Standard | Requirement |
|---|---|
| Front Setback (min) | 25' (k) |
| Side Interior Setback (min) | 10' |
| Side Setback Abutting Street (min) | 12.5' (k) |
| Rear Setback (min) | 25' |
| Building Height (max) | 35' |
Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RH-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code
RH-3setback & dimensional standards
| Standard | Requirement |
|---|---|
| Front Setback (min) | 10' |
| Side Interior Setback (min) | 1' per 3' of bldg. height, 5' min. (i) |
| Side Setback Abutting Street (min) | 1' per 2' of bldg. height, 10' min. (i) |
| Rear Setback (min) | 15' |
| Building Height (max) | 40' |
Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RH-3 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code
RH-4setback & dimensional standards
| Standard | Requirement |
|---|---|
| Front Setback (min) | 20' |
| Side Interior Setback (min) | 1' per 2' of bldg. height, 5' min. (i) |
| Side Setback Abutting Street (min) | 1' per 2' of bldg. height, 10' min. (i) |
| Rear Setback (min) | 20' |
| Building Height (max) | 35' |
Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RH-4 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code
RH-5setback & dimensional standards
| Standard | Requirement |
|---|---|
| Front Setback (min) | 25' (k) |
| Side Interior Setback (min) | 10' |
| Side Setback Abutting Street (min) | 12.5' (k) |
| Rear Setback (min) | 25' |
| Building Height (max) | 35' |
Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RH-5 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code
RH-6setback & dimensional standards
| Standard | Requirement |
|---|---|
| Front Setback (min) | 15' |
| Side Interior Setback (min) | 0' or 3' |
| Side Setback Abutting Street (min) | 1' per 2' of bldg. height, 10' min. (i) |
| Rear Setback (min) | 15' |
| Building Height (max) | 35' |
Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RH-6 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code
RH-7setback & dimensional standards
| Standard | Requirement |
|---|---|
| Front Setback (min) | 10' |
| Side Interior Setback (min) | 1' per 3' of bldg. height, 5' min. (i) |
| Side Setback Abutting Street (min) | 1' per 2' of bldg. height, 10' min. (i) |
| Rear Setback (min) | 15' |
| Building Height (max) | 40' |
Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RH-7 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code
RL-1setback & dimensional standards
| Standard | Requirement |
|---|---|
| Front Setback (min) | 25' (k) |
| Side Interior Setback (min) | 5' |
| Side Setback Abutting Street (min) | 12.5' (k) |
| Rear Setback (min) | 25' |
| Building Height (max) | 35' |
Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RL-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code
RL-2setback & dimensional standards
| Standard | Requirement |
|---|---|
| Front Setback (min) | 20' |
| Side Interior Setback (min) | 1' per 2' of bldg. height, 5' min. (i) |
| Side Setback Abutting Street (min) | 10' |
| Rear Setback (min) | 20' |
| Building Height (max) | 35' |
Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RL-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code
RM-1setback & dimensional standards
| Standard | Requirement |
|---|---|
| Front Setback (min) | 20' |
| Side Interior Setback (min) | 1' per 2' of bldg. height, 5' min. (i) |
| Side Setback Abutting Street (min) | 10' |
| Rear Setback (min) | 20' |
| Building Height (max) | 35' |
Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RM-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code
RM-2setback & dimensional standards
| Standard | Requirement |
|---|---|
| Front Setback (min) | 25' (k) |
| Side Interior Setback (min) | 5' |
| Side Setback Abutting Street (min) | 12.5' (k) |
| Rear Setback (min) | 25' |
| Building Height (max) | 35' |
Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RM-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code
RM-3setback & dimensional standards
| Standard | Requirement |
|---|---|
| Front Setback (min) | 15' |
| Side Interior Setback (min) | 0' or 3' |
| Side Setback Abutting Street (min) | 1' per 2' of bldg. height, 10' min. (i) |
| Rear Setback (min) | 15' |
| Building Height (max) | 35' |
Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RM-3 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code
RMX-1setback & dimensional standards
| Standard | Requirement |
|---|---|
| Front Setback (min) | 25' (k) |
| Side Interior Setback (min) | 5' |
| Side Setback Abutting Street (min) | 12.5' (k) |
| Rear Setback (min) | 25' |
| Building Height (max) | 35' |
Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RMX-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code
RMX-2setback & dimensional standards
| Standard | Requirement |
|---|---|
| Front Setback (min) | 15' |
| Side Interior Setback (min) | 0' (attached DUs); 1' per 2' of bldg. height, 5' min. (detached DUs) (i) |
| Side Setback Abutting Street (min) | 0' (attached DUs); 1' per 2' of bldg. height, 5' min. (detached DUs) (i) |
| Rear Setback (min) | 20' |
| Building Height (max) | 35' |
Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RMX-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code
RR-1setback & dimensional standards
| Standard | Requirement |
|---|---|
| Front Setback (min) | 25' (k) |
| Side Interior Setback (min) | 15' |
| Side Setback Abutting Street (min) | 25' |
| Rear Setback (min) | 25' |
| Building Height (max) | 35' |
Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RR-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code
RR-2setback & dimensional standards
| Standard | Requirement |
|---|---|
| Front Setback (min) | 25' (k) |
| Side Interior Setback (min) | 10' |
| Side Setback Abutting Street (min) | 25' |
| Rear Setback (min) | 25' |
| Building Height (max) | 35' |
Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RR-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code
Verify current requirements with the jurisdiction — informational reference only. Standards vary by overlay, lot, and use; we confirm the exact rules for your property during feasibility.
text
What Ubiquiti enterprise networking covers
Ubiquiti enterprise networking projects in the Denver metro typically include access points, switching, gateways, controller setup, and structured cabling to support office, warehouse, or mixed-use coverage. Scope often adds rack or closet build-outs, PoE planning, VLAN segmentation for guest and device networks, and documentation for handoff. A municipally licensed Denver general contractor coordinates the overall package and the licensed specialty trades required when new electrical circuits or panel work support racks and UPS equipment. Cost is project-specific and depends on coverage area, device counts, cable pathways, and power needs.
text
Design inputs that change the build
AP counts should follow a site survey that accounts for wall types, ceiling height, and interference. PoE switch capacity must match AP, camera, and phone loads. Cable category, pathway availability, and rack depth constrain what can be installed without opening finished spaces. Life-safety systems such as fire alarm remain separate specialties and are not replaced by enterprise Wi-Fi gear.
text
What buyers should prepare
Floor plans, coverage goals, approximate user and IoT device counts, existing ISP handoff details, and whether cameras or access control will share the cable plant. Note the city or county and whether a new electrical circuit is expected for the closet.
FAQ
Common questions
How much does WiFi & Network Assessment (Written Report) cost in Boulder?
$189.
How do I book?
Press Book next to the job, pick a date and a morning (8–12) or afternoon (12–4) window, and pay in full. We confirm within 24 hours or refund you in full.
What's not included?
Hardware and remediation labor are not included.
Who handles permits and licensing for networking projects with power work?
A municipally licensed Denver general contractor coordinates the project and the licensed specialty trades required for electrical scopes. DORA regulates electrical licensing in Colorado. Colorado has no statewide general contractor license.
How many access points do I need?
It depends on floor plan, construction materials, user density, and outdoor needs. A predictive or on-site survey should drive quantities rather than a flat room count.
Can cameras and phones share the same switching?
Often yes when PoE budget, VLANs, and uplink capacity are planned. Device counts should be included before switch selection.
What information helps define an accurate networking scope?
Coverage goals, floor plans, device counts, existing rack/ISP details, whether new power is needed, and the city or county for any electrical permits.
Service Area
Serving Boulder and Boulder County
We serve Boulder, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Boulder project.
How It Runs
01
Survey
02
Design
03
Build
04
Verify
DESIGN SERVICES
Discovery & Site Analysis
Needs + preference programming, site survey, as-built documentation, feasibility.
We walk, measure, and photograph your property — existing conditions, utilities, structure, and constraints. You get the as-built documentation and feasibility read that every later decision rests on.
Learn more →Concept Design & Space Planning
Schematic design, floor plan studies, layout options.
Your scope becomes schematic floor plans you can compare side by side — circulation, daylight, adjacencies, and what each option does to the budget. Layout decisions happen on paper, where changes are cheap.
Learn more →Architectural Design & 3D Renderings
Design development, materials + finishes, photorealistic visualization.
The chosen concept resolves into materials, finishes, fixtures, and lighting — with the automation layer drawn in. Photorealistic renderings let you walk the space and adjust before anything is priced.
Learn more →Construction Documents & Permitting
Full CD sets, structural + MEP engineering coordination, permit-ready drawings.
Approved designs become coordinated architectural, structural, and MEP sheets — the set your jurisdiction permits from and trades build from. We submit, track, and answer review comments.
Learn more →CONSTRUCTION
New Construction & Custom Homes
Ground-up homes and light commercial, dirt to keys.
Ground-up residential and light commercial builds — foundations through finishes, including modular and steel construction. One accountable builder from dirt to keys.
Learn more →Remodels & Additions
Kitchens, baths, basements, pop-tops, whole-home.
Kitchens, baths, basements, pop-tops, and whole-home renovations that respect the house you already have. We handle structure, permits, and the dust.
Learn more →Commercial Tenant Finish & Build-Outs
Shells to working spaces — retail, office, restaurant, school.
Raw shells become working spaces — showrooms, offices, restaurants, schools. Dealer-spec finishes, code compliance, and opening dates held.
Learn more →ADUs & Modular Construction
Backyard cottages, garage conversions, factory-built homes.
Backyard cottages, garage conversions, and factory-built homes — zoning, design, permits, and set. Denver’s ADU rules are a specialty, not a surprise.
Learn more →Outdoor Living & Patio Structures
Decks, pergolas, and dining patios built for Colorado weather.
Decks, pergolas, and dining patios engineered for Colorado sun, snow, and hail — structure, shade, and drainage done right the first time.
Learn more →TECHNOLOGY
Smart Home Automation
Lighting, shades, climate, audio, security — one interface.
Whole-home control of lighting, shades, climate, audio, and security from a single interface — Crestron, Lutron, Savant, and Control4 designed in, not bolted on.
Learn more →A/V Systems
Theaters, distributed audio, video walls, commercial sound.
Theaters, distributed audio, video walls, and commercial sound — designed, installed, and tuned by the same team for over 20 years.
Learn more →Control Systems
Custom programming — scenes and schedules that fit the space.
Every subsystem brought into one elegant interface — custom programming for homes and venues, with scenes and schedules that match how the space is actually used.
Learn more →Networking & Edge Compute
Enterprise Wi-Fi, structured cabling, racks, on-prem compute.
Enterprise-grade Wi-Fi, structured cabling, racks, and on-premise compute — the backbone that makes everything else reliable, including our own Barbot platform.
Learn more →Solar & Energy Storage
Solar arrays, Tesla Powerwall, EV charging — certified install.
Solar arrays, Tesla Powerwall, and EV charging designed and installed by a Tesla Energy Certified team — roof, electrical, and app in one scope.
Learn more →Explore
Also serving
Explore