(720) 287-7958

DESIGN · BUILD · AUTOMATE

BRIGHTON SERVICES

Bump-Out Expansion in Brighton

Home Addition Feasibility Consultation, $300

See all 2 jobs

Licensed bump-out expansion services for Brighton and Adams County. A few extra feet changes everything.

What Brighton requires

Brighton, Colorado (City of Brighton building department) requires a building pe: Any owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing system... §R105.1

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Bump-Out Expansion

A few extra feet changes everything

Jobs you can book online

Pick your job and choose a time.

Pay when you book. We confirm within 24 hours or refund you in full.

  • Home Addition Feasibility Consultation

    We evaluate structure, lot coverage, and zoning for a proposed addition and discuss realistic options.

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    We evaluate structure, lot coverage, and zoning for a proposed addition and discuss realistic options. Includes a one-page feasibility summary with a preliminary budget range.

  • Addition Feasibility Package

    Structural walkthrough, lot coverage and zoning check, and a massing sketch for your proposed addition.

    $425 deposit to book, the rest when the work is done · morning (8–12) or afternoon (12–4)

    What's included

    Structural walkthrough, lot coverage and zoning check, and a massing sketch for your proposed addition. Delivered as a written feasibility report with a preliminary construction budget.

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Bump-Out Expansion Services in Brighton, Colorado

Autotelic provides professional bump-out expansion services throughout Brighton and the surrounding Adams County area. Room bump-out expansions across the Denver metro — extend kitchens, bedrooms, and living rooms 4-12 feet without a full addition. Fast permitting. Whether you're in Brighton (northeast Denver metro) or nearby communities, our team delivers quality workmanship, licensed and insured.

Permit Thresholds

Brighton permit thresholds

Brighton, Colorado (City of Brighton building department) requires a building pe
Any owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing system...§R105.1
Code reference
This is codified in Brighton Municipal Code (BMC) Chapter 15 (Buildings and Construction), particularly Article 15-28 (International Residential Code adoption and amendments).
Building
One-story detached accessory structures (e.g., sheds, playhouses) ≤ 200 sq ft floor area (zoning must still be met); retaining walls ≤ 4 ft high (footing to top); painting, papering, tiling, carpeting, cabinets, countertops, and similar finish work; prefabricated swimming pools < 24" deep; swing set
Electrical
Listed plug-and-cord temporary decorative lighting; replacement of a circuit breaker (same location/capacity); low-voltage wiring/devices (< 25 volts, ≤ 50 watts); minor repairs like changing bulbs or same-location fixture/outlet replacement.
Notes on exemptions and triggers
The FAQ lists slightly varying shed thresholds (e.g., < 120 sq ft in one place); the dedicated permit guide (200 sq ft) is the more specific reference.
Code reference
Any structural alteration, enlargement, or repair affecting the structure generally triggers a permit under the broad “alter/repair” language of R105.1 (no separate valuation-based threshold or explicit “structural trigger” list beyond this).
Use tax/fee basis
Use tax is 3.75% applied to 50% of the project valuation (materials + labor).

Codes are amended regularly — verify current requirements with **The City of Brighton (specifically its Community Development/Building Division) issues residential building permits.

Energy Code

Brighton energy code quick facts

Code reference
2021 IECC (no specific local energy code amendments identified beyond the base code and any applicable state requirements).
Code reference
Brighton’s official codes page explicitly lists the International Energy Conservation Code 2021 (alongside the other 2021 I-Codes).
Code reference
Colorado state law (e.g., HB 22-1362) requires adoption of the 2021 IECC (plus electric/solar ready provisions) when updating other building codes, but Brighton’s published list aligns with the 2021 edition without further local overrides described.
Code reference
Brighton is in Climate Zone 5B (standard for the Denver-metro/Adams County area).
Code reference
Key prescriptive requirements relevant to remodels/additions are drawn from the 2021 IECC (base code) for CZ 5B.
Code reference
Specific numeric values and sections are not detailed in Brighton’s public code listings or amendments pages; refer directly to the 2021 IECC Table R402.1.2 (or equivalent) and related sections for wall/ceiling insulation R-values or U-factors, air-sealing thresholds (typically tested or prescriptiv
Code reference
The city adopts the 2021 IECC via its standard building code adoption process (see codes page and related ordinances adopting the 2021 I-Codes).
Construction use tax
City of Brighton imposes a 3.75% city use tax on construction and building materials (paid on an estimated basis at permit issuance; contractors track and reconcile actuals; present permit to suppliers to avoid duplicate city sales tax).

Codes are amended regularly — verify current requirements with **The City of Brighton (specifically its Community Development/Building Division) issues residential building permits.

text

What this covers

Small floor-area additions that extend an existing room a few feet, usually on a new or extended foundation. Structure, envelope, and openings must match the existing house and Denver setbacks.

FAQ

Common questions

How much does Home Addition Feasibility Consultation cost in Brighton?

$300.

How do I book?

Press Book next to the job, pick a date and a morning (8–12) or afternoon (12–4) window, and pay in full. We confirm within 24 hours or refund you in full.

Who handles the bump-out expansion permits and licensing?

A municipally licensed Denver general contractor coordinates licensed specialty trades. Colorado has no statewide general-contractor license; cities and counties license general contractors. DORA licenses electrical and plumbing, not general contractors.

What is typically in scope for bump-out expansion in Denver?

Small floor-area additions that extend an existing room a few feet, usually on a new or extended foundation.

Service Area

Serving Brighton and Adams County

We serve Brighton, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Brighton project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

Free Estimate

Get a free bump-out expansion estimate in Brighton

Tell us about your Brighton project — we respond fast, and estimates are always free.

Name, phone, and email required.

Verifying you're human…