autotelic.build(720) 287-7958

DESIGN · BUILD · AUTOMATE

BOULDER SERVICES

Appliance Installation in Boulder

Dishwasher Install (Existing Hookups), $295

See all 7 jobs

Licensed appliance installation services for Boulder and Boulder County. Professional hookup and testing.

What Boulder requires

Exempt work (no permit required, though work must still comply with all applicab: The complete list is referenced in Boulder Revised Code (B.R.C.) 1981, Title 10, Chapter 5, Section 10-5-2 (Adoption of International Building Code with Modifications, including exemptions in section J). §10-5-2

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Appliance Installation

Professional hookup and testing

Jobs you can book online

Pick your job and choose a time.

Pay when you book. We confirm within 24 hours or refund you in full.

Fixed-price jobs

  • Dishwasher Install (Existing Hookups)

    Remove old dishwasher and install a customer-supplied replacement in the same opening using existing water, drain, and electrical connections: new supply line and installation kit included, unit leveled, secured, and…

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    Remove old dishwasher and install a customer-supplied replacement in the same opening using existing water, drain, and electrical connections: new supply line and installation kit included, unit leveled, secured, and run through a leak-check cycle. Includes haul-away of the old unit to your curb/bin. NOT included: the dishwasher, cabinet modification, new circuits or outlets, first-time installs where no hookups exist, or countertop bracket epoxy in stone (we use side-mount where possible).

  • Dryer Cord Replacement

    Install a new 3-prong or 4-prong dryer cord (cord included) to match your existing receptacle, with correct neutral/ground bonding-strap configuration at the appliance terminal block, strain relief, and operational test.

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    Install a new 3-prong or 4-prong dryer cord (cord included) to match your existing receptacle, with correct neutral/ground bonding-strap configuration at the appliance terminal block, strain relief, and operational test. Includes pulling and re-setting the dryer and reattaching the vent duct as found. Assumes existing receptacle and circuit are serviceable. Excludes receptacle replacement and dryer vent cleaning or rerouting.

  • Over-the-Range Microwave Swap

    Replacement of an existing over-the-range microwave with a customer-supplied new unit in the same location: removal of old unit, new wall bracket and top-cabinet template mounting, reconnection to the existing outlet,…

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    Replacement of an existing over-the-range microwave with a customer-supplied new unit in the same location: removal of old unit, new wall bracket and top-cabinet template mounting, reconnection to the existing outlet, vent alignment to the existing recirculating or exterior duct configuration, and function test. Old unit left curbside or in garage. Excludes microwave purchase, first-time installs where no OTR unit exists, new circuit or outlet work, duct rerouting, and cabinet modification.

  • Range Cord Replacement

    Install a new 3-prong or 4-prong range cord (cord included) on your electric range to match your existing receptacle, including correct bonding-strap configuration per cord type, strain relief, and test.

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    Install a new 3-prong or 4-prong range cord (cord included) on your electric range to match your existing receptacle, including correct bonding-strap configuration per cord type, strain relief, and test. Includes pulling and re-setting the appliance. Assumes the existing receptacle and circuit are serviceable. Excludes receptacle replacement (see dryer/range outlet tasks) and appliance repair.

  • Range Hood Swap — Existing Duct and Circuit

    Remove existing under-cabinet or wall-mount range hood and install customer-supplied replacement using the existing duct opening and existing power (hardwired whip or receptacle).

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    Remove existing under-cabinet or wall-mount range hood and install customer-supplied replacement using the existing duct opening and existing power (hardwired whip or receptacle). Includes mounting, duct collar connection with foil tape, electrical connection, and function test of fan and lights. Assumes replacement hood matches existing duct size/direction and existing power location reaches the new unit. Excludes duct resizing or rerouting, converting ducted to recirculating (or vice versa), microwave/hood combos, and new circuits.

  • Range Hookup + Anti-Tip Bracket (Electric Only)

    Setup of one customer-supplied electric range at an existing 240V range receptacle: cord installation (3- or 4-prong cord included), anti-tip bracket anchored to floor or wall per spec, placement, leveling, and…

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    Setup of one customer-supplied electric range at an existing 240V range receptacle: cord installation (3- or 4-prong cord included), anti-tip bracket anchored to floor or wall per spec, placement, leveling, and burner/oven function test. ELECTRIC RANGES ONLY — gas connections are not offered under this service. Excludes range purchase, new circuit or receptacle work, cooktop/wall-oven installs, and cabinet modification.

  • Washer/Dryer Stacking Kit Install

    Stacking of a matching front-load washer and dryer using the manufacturer's customer-supplied stacking kit: disconnect, stack and secure per spec, reconnect water, drain, existing electric supply, and existing vent,…

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    Stacking of a matching front-load washer and dryer using the manufacturer's customer-supplied stacking kit: disconnect, stack and secure per spec, reconnect water, drain, existing electric supply, and existing vent, level the pair, and run a test cycle. Excludes stacking kit purchase, gas dryer connections, new vent or plumbing runs, pedestal removal disposal, and moving units between floors.

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Appliance Installation Services in Boulder, Colorado

Autotelic provides professional appliance installation services throughout Boulder and the surrounding Boulder County area. Kitchen and laundry appliance installation including gas and electric connections, leveling, and testing. Whether you're in Boulder (home to CU Boulder) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.

The build sequence for a Appliance Installation project

Every project starts with a feasibility study; this trade is priced from the same assemblies.

  1. Appliance Installation feasibility in Boulder
  2. How a Appliance Installation project is estimated

Start a Appliance Installation feasibility study

Permit Thresholds

Boulder permit thresholds

Exempt work (no permit required, though work must still comply with all applicab
The complete list is referenced in Boulder Revised Code (B.R.C.) 1981, Title 10, Chapter 5, Section 10-5-2 (Adoption of International Building Code with Modifications, including exemptions in section J).§10-5-2
Code reference
Minor drywall repairs (<1 sheet or 32 sq ft).
Code reference
One-story accessory sheds (≤120 sq ft, ≤10 ft high, no utilities/electrical/mechanical/plumbing).
Code reference
Fences ≤7 ft high.
Code reference
Flatwork (private sidewalks, patios, driveways) ≤30 inches above grade, not over a basement/story below, and not part of an accessible route.
Code reference
Playground equipment accessory to 1- or 2-family dwellings.
Code reference
Prefabricated above-ground swimming pools accessory to 1- or 2-family dwellings (<24 inches deep, ≤5,000 gallons).
Code reference
Retaining walls ≤3 ft high (measured from footing bottom to wall top), unless supporting a surcharge or impounding certain flammables.

Codes are amended regularly — verify current requirements with **City of Boulder Planning and Development Services (P&DS; specifically its Building Permits and Inspections section) issues residential building permits for properties within Boulder city limits.

Energy Code

Boulder energy code quick facts

Code reference
2024 City of Boulder Energy Conservation Code (CoBECC), effective December 1, 2024 (based on the 2024 ICC suite of codes with local amendments; all-electric requirements for new construction, additions, and major alterations).
Code reference
This applies to the City of Boulder (not unincorporated Boulder County, which follows the 2021 IECC with amendments effective July 1, 2026).
Code reference
The code emphasizes performance paths (e.g., ERI/HERS targets) for most projects but retains prescriptive options for smaller additions/remodels (≤1,000 sf for residential).
Code reference
Boulder is in Climate Zone 5B.
Code reference
Prescriptive requirements align closely with or reference 2024 IECC Table R402.1.2 (and related sections R401–R404, R407–R408) unless locally amended; projects often use performance paths due to stringency.
Code reference
Key prescriptive requirements relevant to remodels/additions (from CoBECC/2024 IECC Table R402.1.2 and related sections for CZ 5B; cite the adopting code section or CoBECC equivalent):
Ceiling/attic insulation
R-49 minimum (R402.1.2 / CoBECC Chapter 4 RE).
Wood-frame above-grade walls
R-20 + R-5 continuous insulation (ci), or R-13 + R-10 ci, or R-20 ci (R402.1.2 / CoBECC Chapter 4 RE).

Codes are amended regularly — verify current requirements with **City of Boulder Planning and Development Services (P&DS; specifically its Building Permits and Inspections section) issues residential building permits for properties within Boulder city limits.

Zoning & Dimensional Standards

Setback & dimensional standards in Boulder

Zone-district dimensional standards for Boulder, quoted verbatim from the Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026). Knowing your lot's district — and its setbacks, height, and coverage limits — is where every feasibility conversation starts.

Asetback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)15'
Side Setback Abutting Street (min)25'
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) A setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

BCsetback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)15'
Rear Setback (min)20'
Building Height (max)35'; 40' (in I-zones)

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) BC setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

BCSsetback & dimensional standards
StandardRequirement
Front Setback (min)10'
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)10'
Rear Setback (min)20'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) BCS setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

BMSsetback & dimensional standards
StandardRequirement
Front Setback (min)0' (k)
Side Interior Setback (min)0' or 5'
Side Setback Abutting Street (min)0' for first and second stories 12' for third story and above
Rear Setback (min)0'
Building Height (max)38'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) BMS setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

BRsetback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)15'
Rear Setback (min)20'
Building Height (max)35'; 40' (in I-zones)

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) BR setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

BT-1setback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)15'
Rear Setback (min)20'
Building Height (max)35'; 40' (in I-zones)

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) BT-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

BT-2setback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)10'
Side Setback Abutting Street (min)15'
Rear Setback (min)25'
Building Height (max)35'; 40' (in I-zones)

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) BT-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

DT-1setback & dimensional standards
StandardRequirement
Front Setback (min)0' (k)
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)0' (k)
Rear Setback (min)15'
Building Height (max)38'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) DT-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

DT-2setback & dimensional standards
StandardRequirement
Front Setback (min)0' (k)
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)0' (k)
Rear Setback (min)15'
Building Height (max)38'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) DT-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

DT-3setback & dimensional standards
StandardRequirement
Front Setback (min)0' (k)
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)0' (k)
Rear Setback (min)15'
Building Height (max)38'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) DT-3 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

DT-4setback & dimensional standards
StandardRequirement
Front Setback (min)0' (k)
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)0'
Rear Setback (min)15'
Building Height (max)38'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) DT-4 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

DT-5setback & dimensional standards
StandardRequirement
Front Setback (min)0' (k)
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)0' (k)
Rear Setback (min)15'
Building Height (max)38'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) DT-5 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

IGsetback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)15'
Rear Setback (min)20'
Building Height (max)35'; 40' (in I-zones)

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) IG setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

IMsetback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)15'
Rear Setback (min)20'
Building Height (max)35'; 40' (in I-zones)

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) IM setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

IMSsetback & dimensional standards
StandardRequirement
Front Setback (min)0' (k)
Side Interior Setback (min)0' or 5'
Side Setback Abutting Street (min)0'
Rear Setback (min)10'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) IMS setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

IS-1setback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)15'
Rear Setback (min)20'
Building Height (max)35'; 40' (in I-zones)

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) IS-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

IS-2setback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)15'
Rear Setback (min)20'
Building Height (max)35'; 40' (in I-zones)

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) IS-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

MHsetback & dimensional standards
StandardRequirement
Front Setback (min)See section 9-7-13
Side Interior Setback (min)See section 9-7-13
Rear Setback (min)See section 9-7-13
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) MH setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

MU-1setback & dimensional standards
StandardRequirement
Front Setback (min)15'
Side Interior Setback (min)0' or 5'
Side Setback Abutting Street (min)0' or 5' (b)
Rear Setback (min)10'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) MU-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

MU-2setback & dimensional standards
StandardRequirement
Front Setback (min)0' (k)
Side Interior Setback (min)0' or 5'
Side Setback Abutting Street (min)0'
Rear Setback (min)10'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) MU-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

MU-3setback & dimensional standards
StandardRequirement
Front Setback (min)0' (k)
Side Interior Setback (min)0' or 5'
Side Setback Abutting Street (min)0' for first and second stories 12' for third story and above
Rear Setback (min)15'
Building Height (max)38'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) MU-3 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

MU-4setback & dimensional standards
StandardRequirement
Front Setback (min)0' (k)
Side Interior Setback (min)0' or 5'
Side Setback Abutting Street (min)0' for first and second stories 12' for third story and above
Rear Setback (min)0'
Building Height (max)38'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) MU-4 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

Psetback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)10'
Side Setback Abutting Street (min)12.5' (k)
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) P setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

REsetback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)10'
Side Setback Abutting Street (min)25'
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RE setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RH-1setback & dimensional standards
StandardRequirement
Front Setback (min)15'
Side Interior Setback (min)0' or 3'
Side Setback Abutting Street (min)1' per 2' of bldg. height, 10' min. (i)
Rear Setback (min)15'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RH-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RH-2setback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)10'
Side Setback Abutting Street (min)12.5' (k)
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RH-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RH-3setback & dimensional standards
StandardRequirement
Front Setback (min)10'
Side Interior Setback (min)1' per 3' of bldg. height, 5' min. (i)
Side Setback Abutting Street (min)1' per 2' of bldg. height, 10' min. (i)
Rear Setback (min)15'
Building Height (max)40'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RH-3 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RH-4setback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)1' per 2' of bldg. height, 5' min. (i)
Side Setback Abutting Street (min)1' per 2' of bldg. height, 10' min. (i)
Rear Setback (min)20'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RH-4 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RH-5setback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)10'
Side Setback Abutting Street (min)12.5' (k)
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RH-5 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RH-6setback & dimensional standards
StandardRequirement
Front Setback (min)15'
Side Interior Setback (min)0' or 3'
Side Setback Abutting Street (min)1' per 2' of bldg. height, 10' min. (i)
Rear Setback (min)15'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RH-6 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RH-7setback & dimensional standards
StandardRequirement
Front Setback (min)10'
Side Interior Setback (min)1' per 3' of bldg. height, 5' min. (i)
Side Setback Abutting Street (min)1' per 2' of bldg. height, 10' min. (i)
Rear Setback (min)15'
Building Height (max)40'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RH-7 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RL-1setback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)5'
Side Setback Abutting Street (min)12.5' (k)
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RL-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RL-2setback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)1' per 2' of bldg. height, 5' min. (i)
Side Setback Abutting Street (min)10'
Rear Setback (min)20'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RL-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RM-1setback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)1' per 2' of bldg. height, 5' min. (i)
Side Setback Abutting Street (min)10'
Rear Setback (min)20'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RM-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RM-2setback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)5'
Side Setback Abutting Street (min)12.5' (k)
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RM-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RM-3setback & dimensional standards
StandardRequirement
Front Setback (min)15'
Side Interior Setback (min)0' or 3'
Side Setback Abutting Street (min)1' per 2' of bldg. height, 10' min. (i)
Rear Setback (min)15'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RM-3 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RMX-1setback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)5'
Side Setback Abutting Street (min)12.5' (k)
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RMX-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RMX-2setback & dimensional standards
StandardRequirement
Front Setback (min)15'
Side Interior Setback (min)0' (attached DUs); 1' per 2' of bldg. height, 5' min. (detached DUs) (i)
Side Setback Abutting Street (min)0' (attached DUs); 1' per 2' of bldg. height, 5' min. (detached DUs) (i)
Rear Setback (min)20'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RMX-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RR-1setback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)15'
Side Setback Abutting Street (min)25'
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RR-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RR-2setback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)10'
Side Setback Abutting Street (min)25'
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RR-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

Verify current requirements with the jurisdiction — informational reference only. Standards vary by overlay, lot, and use; we confirm the exact rules for your property during feasibility.

text

What appliance installation covers

Residential appliance work in the Denver metro includes ranges, cooktops, ovens, dishwashers, laundry, refrigerators, and water heaters. Some units plug into an existing receptacle. Others need a new 120 or 240 V circuit, a gas connection, or a water and vent change. Water heaters also need a working temperature-and-pressure relief valve and a properly terminated discharge pipe. A municipally licensed Denver general contractor coordinates the project and licensed specialty trades. Cost is project-specific and depends on fuel type, circuit or gas work, and whether the unit is a like-for-like swap.

text

Water heaters and energy code

City inspections check water-heater venting and T&P discharge termination. Denver Energy Code Chapter 5 [RE] applies when an alteration or addition includes a new service hot-water system (DEC R403.5). Like-for-like replacements with no change in geometry, demand, or material may use a CPD quick permit without plumbing plan review. Changing fuel type, location, or capacity is not like-for-like.

text

Permits and who coordinates the work

City and County of Denver Community Planning and Development issues plumbing permits when fixtures or water heaters are added, replaced, or relocated. New circuits and hardwired appliances need electrical permits. Gas appliance changes typically need plumbing or gas review. Colorado DORA regulates electrical and plumbing licensing. Cities and counties license general contractors. Colorado has no statewide general contractor license. Autotelic acts as a municipally licensed Denver general contractor and coordinates licensed specialty trades for appliance scopes.

text

What buyers should prepare

Appliance type, gas versus electric, photos of the existing receptacle or gas valve, and water-heater location and vent type.

Installed cost

Appliances: typical Denver kitchen, installed

Essential
$2,000 – $3,000
Premium
$3,500 – $4,500
Luxury
$16,000 – $18,000

Prices as of September 2026 · Boulder projects are priced on the same Denver-metro estimate.

See materials and what's included →

FAQ

Common questions

How much does Dishwasher Install (Existing Hookups) cost in Boulder?

$295.

How do I book?

Press Book next to the job, pick a date and a morning (8–12) or afternoon (12–4) window, and pay in full. We confirm within 24 hours or refund you in full.

What's not included?

NOT included: the dishwasher, cabinet modification, new circuits or outlets, first-time installs where no hookups exist, or countertop bracket epoxy in stone (we use side-mount where possible).

Does replacing a water heater need a Denver permit?

Yes. CPD requires a plumbing permit when a water heater is replaced. Some like-for-like swaps qualify for a quick permit.

Who handles appliance permits and licensing?

A municipally licensed Denver general contractor coordinates the project and licensed specialty trades. Colorado has no statewide general contractor license.

Do I need a permit to plug in a new refrigerator?

Usually no if it uses an existing receptacle with no wiring change. New circuits or hardwired units typically need an electrical permit.

What do inspectors look for on a water heater?

Proper venting, a working T&P valve, and a discharge pipe that terminates correctly.

What information helps define scope?

Appliance list, fuel type, panel or gas photos, and city or county.

Service Area

Serving Boulder and Boulder County

We serve Boulder, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Boulder project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

Free Estimate

Get a free appliance installation estimate in Boulder

Tell us about your Boulder project — we respond fast, and estimates are always free.

Name, phone, and email required.

Verifying you're human…