DESIGN · BUILD · AUTOMATE
AURORA SERVICES
Appliance Installation in Aurora
Dishwasher Install (Existing Hookups), $295
See all 7 jobsLicensed appliance installation services for Aurora and Arapahoe/Adams County. Professional hookup and testing.
What Aurora requires
Aurora City Code § 22-184 (amending IRC R105.2) exempts only: one-story detached accessory residential storage sheds, playhouses, or shade structures ≤120 sq ft, not attached to the residence, and not used for vehicle storage. § 22-184
See full local requirements ↓- Full Design Lifecycle
- Construction & Tenant Finish
- Smart Home · A/V · Edge Compute

Professional hookup and testing
Jobs you can book online
Pick your job and choose a time.
Pay when you book. We confirm within 24 hours or refund you in full.
Fixed-price jobs
Dishwasher Install (Existing Hookups)
Remove old dishwasher and install a customer-supplied replacement in the same opening using existing water, drain, and electrical connections: new supply line and installation kit included, unit leveled, secured, and…
Pay when you book · morning (8–12) or afternoon (12–4)
What's included
Remove old dishwasher and install a customer-supplied replacement in the same opening using existing water, drain, and electrical connections: new supply line and installation kit included, unit leveled, secured, and run through a leak-check cycle. Includes haul-away of the old unit to your curb/bin. NOT included: the dishwasher, cabinet modification, new circuits or outlets, first-time installs where no hookups exist, or countertop bracket epoxy in stone (we use side-mount where possible).
Dryer Cord Replacement
Install a new 3-prong or 4-prong dryer cord (cord included) to match your existing receptacle, with correct neutral/ground bonding-strap configuration at the appliance terminal block, strain relief, and operational test.
Pay when you book · morning (8–12) or afternoon (12–4)
What's included
Install a new 3-prong or 4-prong dryer cord (cord included) to match your existing receptacle, with correct neutral/ground bonding-strap configuration at the appliance terminal block, strain relief, and operational test. Includes pulling and re-setting the dryer and reattaching the vent duct as found. Assumes existing receptacle and circuit are serviceable. Excludes receptacle replacement and dryer vent cleaning or rerouting.
Over-the-Range Microwave Swap
Replacement of an existing over-the-range microwave with a customer-supplied new unit in the same location: removal of old unit, new wall bracket and top-cabinet template mounting, reconnection to the existing outlet,…
Pay when you book · morning (8–12) or afternoon (12–4)
What's included
Replacement of an existing over-the-range microwave with a customer-supplied new unit in the same location: removal of old unit, new wall bracket and top-cabinet template mounting, reconnection to the existing outlet, vent alignment to the existing recirculating or exterior duct configuration, and function test. Old unit left curbside or in garage. Excludes microwave purchase, first-time installs where no OTR unit exists, new circuit or outlet work, duct rerouting, and cabinet modification.
Range Cord Replacement
Install a new 3-prong or 4-prong range cord (cord included) on your electric range to match your existing receptacle, including correct bonding-strap configuration per cord type, strain relief, and test.
Pay when you book · morning (8–12) or afternoon (12–4)
What's included
Install a new 3-prong or 4-prong range cord (cord included) on your electric range to match your existing receptacle, including correct bonding-strap configuration per cord type, strain relief, and test. Includes pulling and re-setting the appliance. Assumes the existing receptacle and circuit are serviceable. Excludes receptacle replacement (see dryer/range outlet tasks) and appliance repair.
Range Hood Swap — Existing Duct and Circuit
Remove existing under-cabinet or wall-mount range hood and install customer-supplied replacement using the existing duct opening and existing power (hardwired whip or receptacle).
Pay when you book · morning (8–12) or afternoon (12–4)
What's included
Remove existing under-cabinet or wall-mount range hood and install customer-supplied replacement using the existing duct opening and existing power (hardwired whip or receptacle). Includes mounting, duct collar connection with foil tape, electrical connection, and function test of fan and lights. Assumes replacement hood matches existing duct size/direction and existing power location reaches the new unit. Excludes duct resizing or rerouting, converting ducted to recirculating (or vice versa), microwave/hood combos, and new circuits.
Range Hookup + Anti-Tip Bracket (Electric Only)
Setup of one customer-supplied electric range at an existing 240V range receptacle: cord installation (3- or 4-prong cord included), anti-tip bracket anchored to floor or wall per spec, placement, leveling, and…
Pay when you book · morning (8–12) or afternoon (12–4)
What's included
Setup of one customer-supplied electric range at an existing 240V range receptacle: cord installation (3- or 4-prong cord included), anti-tip bracket anchored to floor or wall per spec, placement, leveling, and burner/oven function test. ELECTRIC RANGES ONLY — gas connections are not offered under this service. Excludes range purchase, new circuit or receptacle work, cooktop/wall-oven installs, and cabinet modification.
Washer/Dryer Stacking Kit Install
Stacking of a matching front-load washer and dryer using the manufacturer's customer-supplied stacking kit: disconnect, stack and secure per spec, reconnect water, drain, existing electric supply, and existing vent,…
Pay when you book · morning (8–12) or afternoon (12–4)
What's included
Stacking of a matching front-load washer and dryer using the manufacturer's customer-supplied stacking kit: disconnect, stack and secure per spec, reconnect water, drain, existing electric supply, and existing vent, level the pair, and run a test cycle. Excludes stacking kit purchase, gas dryer connections, new vent or plumbing runs, pedestal removal disposal, and moving units between floors.
FREE PLANNING TOOLS
Both tools are free and take a couple of minutes — start in either one.
EVERY PROJECT STARTS WITH DESIGN
Local Service
Appliance Installation Services in Aurora, Colorado
Autotelic provides professional appliance installation services throughout Aurora and the surrounding Arapahoe/Adams County area. Kitchen and laundry appliance installation including gas and electric connections, leveling, and testing. Whether you're in Aurora (Colorado's third-largest city) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.
The build sequence for a Appliance Installation project
Every project starts with a feasibility study; this trade is priced from the same assemblies.
Permits & Licensing
Permits in Aurora
Aurora building permits are issued by the Building Division's Permit Center, which also handles public improvement, sign, and lawn and irrigation permits. Contractor licensing is a City of Aurora requirement, and applications go through the Aurora4Biz.org online portal. Authority: City of Aurora — Building Division (Permit Center).
Permit Thresholds
Aurora permit thresholds
- Code reference
- Permits are generally required for residential remodel work in Aurora, Colorado, per the adopted building codes (primarily the 2021 International Residential Code (IRC) with local amendments in Aurora City Code Chapter 22, Article V), unless specifically exempt.
- Aurora City Code § 22-184 (amending IRC R105.2) exempts only
- one-story detached accessory residential storage sheds, playhouses, or shade structures ≤120 sq ft, not attached to the residence, and not used for vehicle storage.§ 22-184
- Code reference
- Aurora City Code § 22-135 (amending IBC 105.2) has similar limited exemptions for certain small accessory structures, fences ≤7 ft high (plus all chain-link fences), and antennae/towers ≤25 ft high.§ 22-135
- Structural triggers
- Any structural alteration, addition, or work affecting load-bearing elements generally requires a permit under the adopted IRC (see R105 and amendments).
- Use tax (construction materials use tax)
- Prior to permit issuance, a deposit is required based on 3.75% (three and three-fourths percent) applied to 50% of the total estimated cost of the building/construction/reconstruction/alteration/expansion/modification/improvement (or 100% of the total estimated cost of construction materials/
- Code reference
- This is per Aurora City Code § 130-61.§ 130-61.
- Code reference
- All information is based on the Aurora Municipal Code (Chapter 22) and official city resources.
Codes are amended regularly — verify current requirements with City of Aurora — Building Division (Permit Center).
Energy Code
Aurora energy code quick facts
- Code reference
- Aurora, Colorado, has adopted the 2021 International Energy Conservation Code (IECC) as its base energy code (with the Colorado Model Electric Ready and Solar Ready Code also required by state law).
- Code reference
- Aurora is in IECC Climate Zone 5B.
- Code reference
- The adopting provision is Aurora City Code § 22-203 (Code adopted, under Article VI, International Energy Conservation Code).§ 22-203
- Code reference
- Key prescriptive requirements relevant to remodels/additions (drawn from 2021 IECC Table R402.1.2 and related sections for CZ 5B; these apply unless a performance path or other compliance option is used):
- Ceiling/attic insulation
- R-49 (2021 IECC Table R402.1.2, CZ 5B).
- Wood-frame wall insulation
- R-20 or 13 + 5ci (continuous insulation) (2021 IECC Table R402.1.2, CZ 5B).
- Floor insulation (over unconditioned space)
- R-30 (2021 IECC Table R402.1.2, CZ 5B).
- Fenestration (windows)
- Maximum U-factor 0.30 and SHGC 0.40 (2021 IECC Table R402.1.2, CZ 5B).
Codes are amended regularly — verify current requirements with City of Aurora — Building Division (Permit Center).
Zoning & Dimensional Standards
Setback & dimensional standards in Aurora
Zone-district dimensional standards for Aurora, quoted verbatim from the Aurora Unified Development Ordinance. Knowing your lot's district — and its setbacks, height, and coverage limits — is where every feasibility conversation starts.
I-1setback & dimensional standards
| Standard | Requirement |
|---|---|
| Rear Setback (min) | 5 ft. |
Aurora Unified Development Ordinance I-1 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code
I-2setback & dimensional standards
| Standard | Requirement |
|---|---|
| Rear Setback (min) | 5 ft. |
Aurora Unified Development Ordinance I-2 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code
R-1setback & dimensional standards
| Standard | Requirement |
|---|---|
| Lot Area, Single-Family Detached (min) | 6,000 sf. [1] |
| Lot Frontage, Single-Family Detached (min) | Subarea A: 50 ft. Subarea B: 60 ft. |
| Front Setback (min) | 25 ft. [4] |
| Side Interior Setback (min) | 5 ft. [6] |
| Side Setback Abutting Local Street (min) | 12.5 ft. |
| Rear Setback (min) | 20 ft. |
| Building Height (max) | 38 ft. |
Aurora Unified Development Ordinance R-1 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code
R-2setback & dimensional standards
| Standard | Requirement |
|---|---|
| Lot Area, Single-Family Detached (min) | 6,000 sf. [1] |
| Lot Frontage, Single-Family Detached (min) | Subarea A: 50 ft. Subarea B: 60 ft. |
| Front Setback (min) | 20 ft. [4] |
| Side Interior Setback (min) | 5 ft.[6] |
| Side Setback Abutting Local Street (min) | 10 ft. |
| Rear Setback (min) | 15 ft. |
| Building Height (max) | 38 ft. |
Aurora Unified Development Ordinance R-2 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code
R-3setback & dimensional standards
| Standard | Requirement |
|---|---|
| Lot Area, Single-Family Detached (min) | 5,000 sf. |
| Lot Frontage, Single-Family Detached (min) | 50 ft. |
| Front Setback (min) | 15 ft. |
| Side Interior Setback (min) | 5 ft. |
| Side Setback Abutting Local Street (min) | 10 ft. |
| Rear Setback (min) | 10 ft. |
| Building Height (max) | 45 ft.[7] |
Aurora Unified Development Ordinance R-3 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code
R-4setback & dimensional standards
| Standard | Requirement |
|---|---|
| Lot Area, Single-Family Detached (min) | 5,000 sf. |
| Lot Frontage, Single-Family Detached (min) | 50 ft. |
| Front Setback (min) | 12 ft. |
| Side Interior Setback (min) | 5 ft. |
| Side Setback Abutting Local Street (min) | 7.5 ft. |
| Rear Setback (min) | 10 ft. |
| Building Height (max) | 65 ft.[8] |
Aurora Unified Development Ordinance R-4 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code
R-MHsetback & dimensional standards
| Standard | Requirement |
|---|---|
| Lot Area, Single-Family Detached (min) | [2] |
| Front Setback (min) | 15 ft. |
| Side Interior Setback (min) | 5 ft. |
| Side Setback Abutting Local Street (min) | 15 ft. |
| Rear Setback (min) | 8 ft. |
| Building Height (max) | 20 ft.[9] |
Aurora Unified Development Ordinance R-MH setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code
R-Rsetback & dimensional standards
| Standard | Requirement |
|---|---|
| Lot Area, Single-Family Detached (min) | 43,560 sf. |
| Lot Frontage, Single-Family Detached (min) | 120 ft. |
| Front Setback (min) | 30 ft. |
| Side Interior Setback (min) | 10 ft. |
| Side Setback Abutting Local Street (min) | 25 ft. |
| Rear Setback (min) | 25 ft. |
| Building Height (max) | 38 ft. |
Aurora Unified Development Ordinance R-R setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code
Verify current requirements with the jurisdiction — informational reference only. Standards vary by overlay, lot, and use; we confirm the exact rules for your property during feasibility.
text
What appliance installation covers
Residential appliance work in the Denver metro includes ranges, cooktops, ovens, dishwashers, laundry, refrigerators, and water heaters. Some units plug into an existing receptacle. Others need a new 120 or 240 V circuit, a gas connection, or a water and vent change. Water heaters also need a working temperature-and-pressure relief valve and a properly terminated discharge pipe. A municipally licensed Denver general contractor coordinates the project and licensed specialty trades. Cost is project-specific and depends on fuel type, circuit or gas work, and whether the unit is a like-for-like swap.
text
Water heaters and energy code
City inspections check water-heater venting and T&P discharge termination. Denver Energy Code Chapter 5 [RE] applies when an alteration or addition includes a new service hot-water system (DEC R403.5). Like-for-like replacements with no change in geometry, demand, or material may use a CPD quick permit without plumbing plan review. Changing fuel type, location, or capacity is not like-for-like.
text
Permits and who coordinates the work
City and County of Denver Community Planning and Development issues plumbing permits when fixtures or water heaters are added, replaced, or relocated. New circuits and hardwired appliances need electrical permits. Gas appliance changes typically need plumbing or gas review. Colorado DORA regulates electrical and plumbing licensing. Cities and counties license general contractors. Colorado has no statewide general contractor license. Autotelic acts as a municipally licensed Denver general contractor and coordinates licensed specialty trades for appliance scopes.
text
What buyers should prepare
Appliance type, gas versus electric, photos of the existing receptacle or gas valve, and water-heater location and vent type.
Installed cost
Appliances: typical Denver kitchen, installed
- Essential
- $2,000 – $3,000
- Premium
- $3,500 – $4,500
- Luxury
- $16,000 – $18,000
Prices as of September 2026 · Aurora projects are priced on the same Denver-metro estimate.
See materials and what's included →FAQ
Common questions
How much does Dishwasher Install (Existing Hookups) cost in Aurora?
$295.
How do I book?
Press Book next to the job, pick a date and a morning (8–12) or afternoon (12–4) window, and pay in full. We confirm within 24 hours or refund you in full.
What's not included?
NOT included: the dishwasher, cabinet modification, new circuits or outlets, first-time installs where no hookups exist, or countertop bracket epoxy in stone (we use side-mount where possible).
Does replacing a water heater need a Denver permit?
Yes. CPD requires a plumbing permit when a water heater is replaced. Some like-for-like swaps qualify for a quick permit.
Who handles appliance permits and licensing?
A municipally licensed Denver general contractor coordinates the project and licensed specialty trades. Colorado has no statewide general contractor license.
Do I need a permit to plug in a new refrigerator?
Usually no if it uses an existing receptacle with no wiring change. New circuits or hardwired units typically need an electrical permit.
What do inspectors look for on a water heater?
Proper venting, a working T&P valve, and a discharge pipe that terminates correctly.
What information helps define scope?
Appliance list, fuel type, panel or gas photos, and city or county.
Service Area
Serving Aurora and Arapahoe/Adams County
We serve Aurora, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Aurora project.
How It Runs
01
Survey
02
Design
03
Build
04
Verify
DESIGN SERVICES
Discovery & Site Analysis
Needs + preference programming, site survey, as-built documentation, feasibility.
We walk, measure, and photograph your property — existing conditions, utilities, structure, and constraints. You get the as-built documentation and feasibility read that every later decision rests on.
Learn more →Concept Design & Space Planning
Schematic design, floor plan studies, layout options.
Your scope becomes schematic floor plans you can compare side by side — circulation, daylight, adjacencies, and what each option does to the budget. Layout decisions happen on paper, where changes are cheap.
Learn more →Architectural Design & 3D Renderings
Design development, materials + finishes, photorealistic visualization.
The chosen concept resolves into materials, finishes, fixtures, and lighting — with the automation layer drawn in. Photorealistic renderings let you walk the space and adjust before anything is priced.
Learn more →Construction Documents & Permitting
Full CD sets, structural + MEP engineering coordination, permit-ready drawings.
Approved designs become coordinated architectural, structural, and MEP sheets — the set your jurisdiction permits from and trades build from. We submit, track, and answer review comments.
Learn more →CONSTRUCTION
New Construction & Custom Homes
Ground-up homes and light commercial, dirt to keys.
Ground-up residential and light commercial builds — foundations through finishes, including modular and steel construction. One accountable builder from dirt to keys.
Learn more →Remodels & Additions
Kitchens, baths, basements, pop-tops, whole-home.
Kitchens, baths, basements, pop-tops, and whole-home renovations that respect the house you already have. We handle structure, permits, and the dust.
Learn more →Commercial Tenant Finish & Build-Outs
Shells to working spaces — retail, office, restaurant, school.
Raw shells become working spaces — showrooms, offices, restaurants, schools. Dealer-spec finishes, code compliance, and opening dates held.
Learn more →ADUs & Modular Construction
Backyard cottages, garage conversions, factory-built homes.
Backyard cottages, garage conversions, and factory-built homes — zoning, design, permits, and set. Denver’s ADU rules are a specialty, not a surprise.
Learn more →Outdoor Living & Patio Structures
Decks, pergolas, and dining patios built for Colorado weather.
Decks, pergolas, and dining patios engineered for Colorado sun, snow, and hail — structure, shade, and drainage done right the first time.
Learn more →TECHNOLOGY
Smart Home Automation
Lighting, shades, climate, audio, security — one interface.
Whole-home control of lighting, shades, climate, audio, and security from a single interface — Crestron, Lutron, Savant, and Control4 designed in, not bolted on.
Learn more →A/V Systems
Theaters, distributed audio, video walls, commercial sound.
Theaters, distributed audio, video walls, and commercial sound — designed, installed, and tuned by the same team for over 20 years.
Learn more →Control Systems
Custom programming — scenes and schedules that fit the space.
Every subsystem brought into one elegant interface — custom programming for homes and venues, with scenes and schedules that match how the space is actually used.
Learn more →Networking & Edge Compute
Enterprise Wi-Fi, structured cabling, racks, on-prem compute.
Enterprise-grade Wi-Fi, structured cabling, racks, and on-premise compute — the backbone that makes everything else reliable, including our own Barbot platform.
Learn more →Solar & Energy Storage
Solar arrays, Tesla Powerwall, EV charging — certified install.
Solar arrays, Tesla Powerwall, and EV charging designed and installed by a Tesla Energy Certified team — roof, electrical, and app in one scope.
Learn more →Explore
Also serving
Explore