autotelic.build(720) 287-7958

DESIGN · BUILD · AUTOMATE

LAKEWOOD SERVICES

Framing in Lakewood

Licensed framing services for Lakewood and Jefferson County. The skeleton of every great build.

  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Framing

The skeleton of every great build

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Framing Services in Lakewood, Colorado

Autotelic provides professional framing services throughout Lakewood and the surrounding Jefferson County area. Wood and steel framing for new construction, additions, and remodels with structural accuracy and fast turnaround. Whether you're in Lakewood (Jefferson County's largest city) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.

Permits & Licensing

Permits in Lakewood

Lakewood building and construction permits are issued through the Public Works Department, and contractors must be registered with the city and hold a Lakewood contractor account before pulling permits. Permitting and inspections run through the city's eTRAKiT online system. Authority: City of Lakewood — Public Works Department (Building and Construction Permits).

Zoning & Dimensional Standards

Setback & dimensional standards in Lakewood

Zone-district dimensional standards for Lakewood, quoted verbatim from the Lakewood Zoning Code (2025). Knowing your lot's district — and its setbacks, height, and coverage limits — is where every feasibility conversation starts.

C-Lsetback & dimensional standards
StandardRequirement
Front Setback (min)15 ft.
Side Setback (min)5 ft.
Rear Setback (min)5 ft.
Building Height (max)45 ft.
Open Space (min %)25%

Lakewood Zoning Code (2025) C-L setback standards (Article 5 Tables 4 & 8 Dimensional Standards (§17.5)) — effective 2025-03-24 · View the code

C-Rsetback & dimensional standards
StandardRequirement
Front Setback (min)15 ft.
Side Setback (min)5 ft.
Rear Setback (min)5 ft.
Building Height (max)90 ft.
Open Space (min %)25%

Lakewood Zoning Code (2025) C-R setback standards (Article 5 Tables 4 & 8 Dimensional Standards (§17.5)) — effective 2025-03-24 · View the code

LIsetback & dimensional standards
StandardRequirement
Front Setback (min)15 ft.
Side Setback (min)5 ft.
Rear Setback (min)5 ft.
Building Height (max)60 ft.
Open Space (min %)25%

Lakewood Zoning Code (2025) LI setback standards (Article 5 Tables 4 & 8 Dimensional Standards (§17.5)) — effective 2025-03-24 · View the code

R-L-Asetback & dimensional standards
StandardRequirement
Front Setback (min)25 ft.
Side Setback (min)10 ft.
Non-Primary Frontage Front Setback (min)20 ft.
Rear Setback (min)15 ft.
Building Height (max)35 ft.
Minimum Lot Size7,000 sq. ft.
Minimum Lot Width75 ft.
Open Space (min %)50%

Lakewood Zoning Code (2025) R-L-A setback standards (Article 5 Tables 4 & 8 Dimensional Standards (§17.5)) — effective 2025-03-24 · View the code

R-L-Bsetback & dimensional standards
StandardRequirement
Front Setback (min)25 ft.
Side Setback (min)5 ft.
Non-Primary Frontage Front Setback (min)20 ft.
Rear Setback (min)15 ft.
Building Height (max)35 ft.
Minimum Lot Size5,000 sq. ft.
Minimum Lot Width60 ft.
Open Space (min %)50%

Lakewood Zoning Code (2025) R-L-B setback standards (Article 5 Tables 4 & 8 Dimensional Standards (§17.5)) — effective 2025-03-24 · View the code

R-L-Csetback & dimensional standards
StandardRequirement
Front Setback (min)25 ft.
Side Setback (min)5 ft.
Non-Primary Frontage Front Setback (min)20 ft.
Rear Setback (min)15 ft.
Building Height (max)35 ft.
Minimum Lot Size1,500 sq. ft.
Minimum Lot Width25 ft.
Open Space (min %)50%

Lakewood Zoning Code (2025) R-L-C setback standards (Article 5 Tables 4 & 8 Dimensional Standards (§17.5)) — effective 2025-03-24 · View the code

R-L-MHsetback & dimensional standards
StandardRequirement
Front Setback (min)25 ft.
Side Setback (min)5 ft.
Non-Primary Frontage Front Setback (min)20 ft.
Rear Setback (min)15 ft.
Building Height (max)25 ft.
Minimum Lot Width35 (SW) 40 (DW)
Open Space (min %)25%

Lakewood Zoning Code (2025) R-L-MH setback standards (Article 5 Tables 4 & 8 Dimensional Standards (§17.5)) — effective 2025-03-24 · View the code

R-Msetback & dimensional standards
StandardRequirement
Front Setback (min)10 ft.
Side Setback (min)5 ft.
Non-Primary Frontage Front Setback (min)10 ft.
Rear Setback (min)15 ft.
Building Height (max)45 ft.
Minimum Lot Width18 ft.
Open Space (min %)30%

Lakewood Zoning Code (2025) R-M setback standards (Article 5 Tables 4 & 8 Dimensional Standards (§17.5)) — effective 2025-03-24 · View the code

Verify current requirements with the jurisdiction — informational reference only. Standards vary by overlay, lot, and use; we confirm the exact rules for your property during feasibility.

text

What framing work covers

Framing in the Denver metro includes partition walls, new openings, blocking, and structural framing for additions or major remodels. Load-bearing changes need careful planning and often engineering. A municipally licensed Denver general contractor coordinates framing and licensed specialty trades for related mechanical openings. Cost is project-specific and depends on span, structure type, and access.

text

Load paths and openings

Removing walls or widening openings can change how loads move through the house. Headers, posts, and foundations must be checked before demo. Temporary shoring may be required during the work.

text

Permits and who coordinates the work

Structural framing and many opening changes typically need building permits and inspections through City and County of Denver Community Planning and Development. Cities and counties license general contractors. Colorado has no statewide general contractor license. Autotelic acts as a municipally licensed Denver general contractor and coordinates licensed specialty trades when the package includes regulated systems.

text

What buyers should prepare

Goals for open layouts, any known prior unpermitted openings, and whether engineering drawings already exist.

FAQ

Common questions

Do I need a Denver permit to remove a wall?

Usually yes if the wall is load-bearing or the opening changes structure. Confirm with CPD and assess the load path first.

Who handles framing permits and licensing?

A municipally licensed Denver general contractor coordinates the project and related specialty trades. Colorado has no statewide general contractor license.

When is an engineer needed?

Commonly when loads change beyond simple partition work. CPD may require engineered details for certain scopes.

Can framing start before other permits?

Follow the issued permit sequence. Rough inspections typically happen before insulation and drywall.

What information helps define scope?

Desired layout changes, photos, existing plans if any, and city or county.

Service Area

Serving Lakewood and Jefferson County

We serve Lakewood, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Lakewood project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

TRUSTED TO BUILD FOR

  • Punch Bowl SocialFirst four locations
  • Spectrum RetirementSenior living communities
  • Denver HighlandsFirst modular custom home

Free Estimate

Get a free framing estimate in Lakewood

Tell us about your Lakewood project — we respond fast, and estimates are always free.

Name, phone, and email required.