autotelic.build(720) 287-7958

DESIGN · BUILD · AUTOMATE

BROOMFIELD SERVICES

Concrete Flatwork in Broomfield

Licensed concrete flatwork services for Broomfield and Broomfield County. Driveways. Patios. Walkways. Done right..

What Broomfield requires

Code reference: Permits and inspections verify compliance with adopted codes (primarily the 2024 International Residential Code and related codes via Ordinance 2295, effective April 15, 2026, under Title 15 / Chapter 15-03 of the Broomfield Municipal Code). Ord. 2295

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Concrete Flatwork

Driveways. Patios. Walkways. Done right.

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Concrete Flatwork Services in Broomfield, Colorado

Autotelic provides professional concrete flatwork services throughout Broomfield and the surrounding Broomfield County area. Concrete flatwork across the Denver metro — patios, driveways, walkways, and garage floors with stamped, broom, and exposed aggregate finishes. Whether you're in Broomfield (city and county between Denver and Boulder) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.

Permit Thresholds

Broomfield permit thresholds

Code reference
Permits and inspections verify compliance with adopted codes (primarily the 2024 International Residential Code and related codes via Ordinance 2295, effective April 15, 2026, under Title 15 / Chapter 15-03 of the Broomfield Municipal Code).Ord. 2295
Use tax (not collapsed into a single rate)
Broomfield collects use tax of 4.15% applied to 50% of the total project valuation (assumed materials portion) at permit issuance for building materials.
Code reference
Use tax of 4.15% is also charged on 50% of site work valuation (e.g., landscaping, patios) per BMC §§ 3-08-040 and 3-08-060; exemptions are in BMC § 3-08-050.§ 3-08-040
Code reference
All information derives from Broomfield’s official Building Division resources and municipal code references (Title 15, Chapter 15-03, and use tax chapter 3-08).

Codes are amended regularly — verify current requirements with **The City and County of Broomfield (specifically its Building Division in the Community Development Department) issues residential building permits.

Energy Code

Broomfield energy code quick facts

Code reference
Broomfield, Colorado (climate zone 5B), has adopted the 2024 International Energy Conservation Code (IECC) as amended by the Colorado Model Low Energy and Carbon Code (MLECC/LECC), via Ordinance 2295 (effective April 15, 2026, for permits issued on or after that date).Ord. 2295
Code reference
This replaces the prior 2021 IECC cycle.
Code reference
Key prescriptive or related requirements relevant to remodels/additions (drawn from the adopted 2024 IECC + MLECC framework; specific numeric envelope values like R-values or U-factors follow the base 2024 IECC tables for zone 5B unless further amended locally, with emphasis on performance/credits,
Air leakage/ testing thresholds (R402.5.1.3 or equivalent in MLECC amendments)
Maximum air leakage rates vary by climate zone and compliance path (e.g., prescriptive or ERI); testing required for many additions/alterations affecting the envelope.
Electric-ready requirements (new Section R409/C410 in MLECC, integrated with pri
Dedicated branch circuits, appropriately sized panel space, labeling, and condensate drainage provisions for future electrification of space heating, water heating, cooking, and clothes drying where combustion equipment is present (applies to alterations adding or replacing such systems).§R409
Solar-ready zone (R409/C410 in MLECC)
Designated solar-ready roof zone with construction document specifications for single-family, townhomes, and certain multifamily (applies to new roofs or major roof work in remodels/additions).
EV-ready spaces (R409/C410 in MLECC, with local amendment)
Conduit/raceway, panel capacity, wiring, and overcurrent protection for future EV charging; local amendment adjusts thresholds (e.g., for smaller lots) and requires at least 20% or a minimum of 2 spaces EV-ready in certain commercial contexts.
Energy efficiency credits (R408/C406 in MLECC)
Additional credits required based on conditioned floor area, occupancy, climate zone (5B), and combustion vs.

Codes are amended regularly — verify current requirements with **The City and County of Broomfield (specifically its Building Division in the Community Development Department) issues residential building permits.

text

What concrete flatwork covers

Flatwork in the Denver metro includes patios, private driveways, walkways, and slabs on the lot, plus public sidewalks, curb ramps, and driveway aprons in the right-of-way. Those two locations use different permit paths. A municipally licensed Denver general contractor coordinates the project and licensed specialty trades. Cost is project-specific and depends on area, thickness, and whether the pour sits in the public way.

text

Private lot versus public sidewalk

Reconstruction of a City sidewalk requires a permit before work begins (Denver Municipal Code Sec. 49). Denver DOTI Right-of-Way Services regulates curbs, gutters, sidewalks, driveways, and other ROW improvements, including driveway aprons. Private patios and drives are typically a zoning and drainage question: site plans often dimension patio and drive coverage, and parking surfaces must meet neighborhood-inspection rules. Grading changes can trigger SUDP review.

text

Permits and who coordinates the work

DOTI handles ROW concrete and street occupancy. City and County of Denver Community Planning and Development handles zoning and building on private property. Cities and counties license general contractors. Colorado has no statewide general contractor license. Autotelic acts as a municipally licensed Denver general contractor and coordinates licensed specialty trades for flatwork scopes.

text

What buyers should prepare

Whether the pour is on the lot or in the sidewalk/apron, drainage direction, and photos of the existing curb cut.

FAQ

Common questions

Does a patio need a Denver permit?

Often a zoning review when coverage or setbacks change. A public sidewalk or apron needs a DOTI ROW permit before work starts.

Who handles flatwork permits and licensing?

A municipally licensed Denver general contractor coordinates the project and licensed specialty trades. Colorado has no statewide general contractor license.

Is the driveway apron the same as the driveway?

No. The apron is the portion in the public right-of-way next to the street. That piece follows DOTI rules, not just private-lot zoning.

Can I park on dirt?

Neighborhood inspections do not allow parking on dirt. Allowed surfaces depend on dwelling type (gravel, road base, asphalt, or concrete).

What information helps define scope?

Lot vs ROW, square footage, drainage photos, and city or county.

Service Area

Serving Broomfield and Broomfield County

We serve Broomfield, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Broomfield project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

TRUSTED TO BUILD FOR

  • Punch Bowl SocialFirst four locations
  • Spectrum RetirementSenior living communities
  • Denver HighlandsFirst modular custom home

Free Estimate

Get a free concrete flatwork estimate in Broomfield

Tell us about your Broomfield project — we respond fast, and estimates are always free.

Name, phone, and email required.

Verifying you're human…