autotelic.build

DESIGN · BUILD · AUTOMATE

AURORA SERVICES

Fire Protection in Aurora

Licensed fire protection services for Aurora and Arapahoe/Adams County. Code-compliant fire safety systems.

  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Fire Protection

Code-compliant fire safety systems

Local Service

Fire Protection Services in Aurora, Colorado

Autotelic provides professional fire protection services throughout Aurora and the surrounding Arapahoe/Adams County area. Fire sprinkler design and installation, fire alarm systems, and code compliance for commercial and multi-family projects. Whether you're in Aurora (Colorado's third-largest city) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.

Permits & Licensing

Permits in Aurora

Aurora building permits are issued by the Building Division's Permit Center, which also handles public improvement, sign, and lawn and irrigation permits. Contractor licensing is a City of Aurora requirement, and applications go through the Aurora4Biz.org online portal. Authority: City of Aurora — Building Division (Permit Center).

Permit Thresholds

Aurora permit thresholds

Code reference
Permits are generally required for residential remodel work in Aurora, Colorado, per the adopted building codes (primarily the 2021 International Residential Code (IRC) with local amendments in Aurora City Code Chapter 22, Article V), unless specifically exempt.
Aurora City Code § 22-184 (amending IRC R105.2) exempts only
one-story detached accessory residential storage sheds, playhouses, or shade structures ≤120 sq ft, not attached to the residence, and not used for vehicle storage.§ 22-184
Code reference
Aurora City Code § 22-135 (amending IBC 105.2) has similar limited exemptions for certain small accessory structures, fences ≤7 ft high (plus all chain-link fences), and antennae/towers ≤25 ft high.§ 22-135
Structural triggers
Any structural alteration, addition, or work affecting load-bearing elements generally requires a permit under the adopted IRC (see R105 and amendments).
Use tax (construction materials use tax)
Prior to permit issuance, a deposit is required based on 3.75% (three and three-fourths percent) applied to 50% of the total estimated cost of the building/construction/reconstruction/alteration/expansion/modification/improvement (or 100% of the total estimated cost of construction materials/
Code reference
This is per Aurora City Code § 130-61.§ 130-61.
Code reference
All information is based on the Aurora Municipal Code (Chapter 22) and official city resources.

Codes are amended regularly — verify current requirements with City of Aurora — Building Division (Permit Center).

Energy Code

Aurora energy code quick facts

Code reference
Aurora, Colorado, has adopted the 2021 International Energy Conservation Code (IECC) as its base energy code (with the Colorado Model Electric Ready and Solar Ready Code also required by state law).
Code reference
Aurora is in IECC Climate Zone 5B.
Code reference
The adopting provision is Aurora City Code § 22-203 (Code adopted, under Article VI, International Energy Conservation Code).§ 22-203
Code reference
Key prescriptive requirements relevant to remodels/additions (drawn from 2021 IECC Table R402.1.2 and related sections for CZ 5B; these apply unless a performance path or other compliance option is used):
Ceiling/attic insulation
R-49 (2021 IECC Table R402.1.2, CZ 5B).
Wood-frame wall insulation
R-20 or 13 + 5ci (continuous insulation) (2021 IECC Table R402.1.2, CZ 5B).
Floor insulation (over unconditioned space)
R-30 (2021 IECC Table R402.1.2, CZ 5B).
Fenestration (windows)
Maximum U-factor 0.30 and SHGC 0.40 (2021 IECC Table R402.1.2, CZ 5B).

Codes are amended regularly — verify current requirements with City of Aurora — Building Division (Permit Center).

Zoning & Dimensional Standards

Setback & dimensional standards in Aurora

Zone-district dimensional standards for Aurora, quoted verbatim from the Aurora Unified Development Ordinance. Knowing your lot's district — and its setbacks, height, and coverage limits — is where every feasibility conversation starts.

I-1setback & dimensional standards
StandardRequirement
Rear Setback (min)5 ft.

Aurora Unified Development Ordinance I-1 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

I-2setback & dimensional standards
StandardRequirement
Rear Setback (min)5 ft.

Aurora Unified Development Ordinance I-2 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-1setback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)6,000 sf. [1]
Lot Frontage, Single-Family Detached (min)Subarea A: 50 ft. Subarea B: 60 ft.
Front Setback (min)25 ft. [4]
Side Interior Setback (min)5 ft. [6]
Side Setback Abutting Local Street (min)12.5 ft.
Rear Setback (min)20 ft.
Building Height (max)38 ft.

Aurora Unified Development Ordinance R-1 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-2setback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)6,000 sf. [1]
Lot Frontage, Single-Family Detached (min)Subarea A: 50 ft. Subarea B: 60 ft.
Front Setback (min)20 ft. [4]
Side Interior Setback (min)5 ft.[6]
Side Setback Abutting Local Street (min)10 ft.
Rear Setback (min)15 ft.
Building Height (max)38 ft.

Aurora Unified Development Ordinance R-2 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-3setback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)5,000 sf.
Lot Frontage, Single-Family Detached (min)50 ft.
Front Setback (min)15 ft.
Side Interior Setback (min)5 ft.
Side Setback Abutting Local Street (min)10 ft.
Rear Setback (min)10 ft.
Building Height (max)45 ft.[7]

Aurora Unified Development Ordinance R-3 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-4setback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)5,000 sf.
Lot Frontage, Single-Family Detached (min)50 ft.
Front Setback (min)12 ft.
Side Interior Setback (min)5 ft.
Side Setback Abutting Local Street (min)7.5 ft.
Rear Setback (min)10 ft.
Building Height (max)65 ft.[8]

Aurora Unified Development Ordinance R-4 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-MHsetback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)[2]
Front Setback (min)15 ft.
Side Interior Setback (min)5 ft.
Side Setback Abutting Local Street (min)15 ft.
Rear Setback (min)8 ft.
Building Height (max)20 ft.[9]

Aurora Unified Development Ordinance R-MH setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-Rsetback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)43,560 sf.
Lot Frontage, Single-Family Detached (min)120 ft.
Front Setback (min)30 ft.
Side Interior Setback (min)10 ft.
Side Setback Abutting Local Street (min)25 ft.
Rear Setback (min)25 ft.
Building Height (max)38 ft.

Aurora Unified Development Ordinance R-R setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

Verify current requirements with the jurisdiction — informational reference only. Standards vary by overlay, lot, and use; we confirm the exact rules for your property during feasibility.

text

What fire protection coordination covers

Fire protection work on Denver-metro projects often includes planning around sprinklers, fire alarms, and related life-safety devices during remodels or tenant improvements. These systems are specialized and typically performed by specialty contractors under permit. A municipally licensed Denver general contractor coordinates the overall project schedule, inspections, and licensed specialty trades. Cost is project-specific and depends on system type, occupancy, and whether work modifies an existing system.

text

Design and inspections

Many scopes need drawings and formal review before install. Inspection sequencing must align with ceiling close-in and occupancy timelines.

text

Permits and who coordinates the work

Fire protection systems typically require Denver Fire and Community Planning and Development review/permits, separate from cosmetic construction. Cities and counties license general contractors. Colorado has no statewide general contractor license. Autotelic acts as a municipally licensed Denver general contractor and coordinates licensed specialty trades for regulated fire protection scopes.

text

What buyers should prepare

Occupancy type, existing system as-builts if available, and whether the project is a remodel or new TI.

FAQ

Common questions

Do fire sprinklers or alarms need permits in Denver?

Typically yes. Fire and building review paths usually apply. Confirm scope with Denver Fire and CPD before work.

Who handles fire protection permits and licensing?

A municipally licensed Denver general contractor coordinates the project and licensed specialty trades that perform the system work. Colorado has no statewide general contractor license.

Can an existing system be modified for a remodel?

Often yes with proper design and permits. As-built information helps.

When do inspections happen?

Per the issued permit sequence, often before ceilings close and before occupancy.

What information helps define scope?

Occupancy, existing system details, remodel drawings, and city or county.

Service Area

Serving Aurora and Arapahoe/Adams County

We serve Aurora, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Aurora project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

TRUSTED TO BUILD FOR

  • Punch Bowl SocialFirst four locations
  • Spectrum RetirementSenior living communities
  • Denver HighlandsFirst modular custom home

Free Estimate

Get a free fire protection estimate in Aurora

Tell us about your Aurora project — we respond fast, and estimates are always free.

Name, phone, and email required.